共 50 条
- [2] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [3] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
- [4] The Genetic Algorithm with two point crossover to solve the Resource-Constrained Project Scheduling Problems 2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,
- [6] Robust optimization for resource-constrained project scheduling with uncertain activity durations Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
- [8] Robust optimization for resource-constrained project scheduling with uncertain activity durations 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
- [10] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations Journal of Scheduling, 2016, 19 : 409 - 428