Analysis and identification of floating capacity bottlenecks in metallurgical production

被引:0
|
作者
Faculty of Metallurgy and Materials Engineering, VŠB - Technical University of Ostrava, Ostrava, Czech Republic [1 ]
机构
来源
Metalurgija | 2007年 / 1卷 / 61-66期
关键词
Bars (metal) - Constraint theory - Flow control - Metal cutting - Metal refineries;
D O I
暂无
中图分类号
学科分类号
摘要
The article constitutes a procedure for the analysis and identification of floating capacity bottlenecks in metallurgical production. The procedure conceived is based on the use of detailed capacity calculations, the output of which is the determination of the hourly output of the floating capacity bottleneck depending on the production schedule. Applying the said procedure is illustrated by the example of output analysis of a line for the cutting of hot rolled bars. Analysis and identification of the floating capacity bottlenecks subsequently becomes the starting point for applying the principles and tools of the Theory of Constraints (TOC) in material flow control in metallurgical plants.
引用
收藏
相关论文
共 50 条
  • [31] QUALITY OF METALLURGICAL PRODUCTION
    LEMPITSK.VV
    STAL IN ENGLISH-USSR, 1965, (03): : 169 - &
  • [32] New Framework for Automatic Identification and Quantification of Freeway Bottlenecks Based on Wavelet Analysis
    Ke, Ruimin
    Zeng, Ziqiang
    Pu, Ziyuan
    Wang, Yinhai
    JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2018, 144 (09)
  • [33] Systematic identification and elimination of flux bottlenecks in the aldehyde production pathway of Synechococcus elongatus PCC 7942
    Cheah, Yi Ern
    Xu, Yao
    Sacco, Sarah A.
    Babele, Piyoosh K.
    Zheng, Amy O.
    Johnson, Carl Hirschie
    Young, Jamey D.
    METABOLIC ENGINEERING, 2020, 60 (56-65) : 56 - 65
  • [34] PROBLEMS OF APPLICATION OF MEASUREMENT SYSTEM ANALYSIS (MSA) IN METALLURGICAL PRODUCTION
    Klaput, P.
    Vykydal, D.
    Tosenovsky, F.
    Halfarova, P.
    Plura, J.
    METALURGIJA, 2016, 55 (03): : 535 - 537
  • [35] Determination of bottlenecks in the production of wooden constructions
    Krajcovicova, Maria
    DREWNO, 2011, 54 (186): : 65 - 73
  • [36] Advances and bottlenecks in microbial hydrogen production
    Stephen, Alan J.
    Archer, Sophie A.
    Orozco, Rafael L.
    Macaskie, Lynne E.
    MICROBIAL BIOTECHNOLOGY, 2017, 10 (05): : 1120 - 1127
  • [37] Analysis of highway bottlenecks
    Chin, HC
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 1996, 117 (02) : 136 - 142
  • [38] Production availability analysis of Floating Production Storage and Offloading (FPSO) systems
    Meng, Huixing
    Kloul, Leila
    Rauzy, Antoine
    APPLIED OCEAN RESEARCH, 2018, 74 : 117 - 126
  • [39] Modelling Dynamic Bottlenecks in Production Networks
    Scholz-Reiter, Bernd
    Windt, Katja
    Liu, Huaxin
    PROCEEDINGS OF THE 6TH CIRP-SPONSORED INTERNATIONAL CONFERENCE ON DIGITAL ENTERPRISE TECHNOLOGY, 2010, 66 : 1445 - +
  • [40] Modelling dynamic bottlenecks in production networks
    Scholz-Reiter, Bernd
    Windt, Katja
    Liu, Huaxin
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2011, 24 (05) : 391 - 404