PROBLEMS OF APPLICATION OF MEASUREMENT SYSTEM ANALYSIS (MSA) IN METALLURGICAL PRODUCTION

被引:0
|
作者
Klaput, P. [1 ]
Vykydal, D. [1 ]
Tosenovsky, F. [1 ]
Halfarova, P. [1 ]
Plura, J. [1 ]
机构
[1] VSB Tech Univ Ostrava, Fac Met & Mat Engn, Ostrava, Czech Republic
来源
METALURGIJA | 2016年 / 55卷 / 03期
关键词
measurement; system; application; metallurgical production; confidence limit;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper lists the most fundamental problems related to the application of measurement system analysis (MSA) in metallurgical production and outlines ways of solving them. Based on the real measurements it was found, that the width of the confidence interval constructed for the value of combined gage repeatability and reproducibility (GRR) can be reduced (and thus the reliability of the GRR value can be increased) more by raising the number of trials than by increasing the number of samples. The basic assumption for the use of analysis of variance (constant variance and the occurrence of outliers) can be verified by using the proposed multiple box and whisker plot.
引用
收藏
页码:535 / 537
页数:3
相关论文
共 50 条
  • [1] Modern problems in metallurgical production
    Metallurg, 2002, (12):
  • [2] MSA METHOD APPLICATION IN EVALUATING OF MEASUREMENT SYSTEM USED TO MEASURE THE ROUGHNESS PARAMETER Ra
    Beckert, Sueli Fischer
    Reitz, Fernanda Jaqueline
    ICEM15: 15TH INTERNATIONAL CONFERENCE ON EXPERIMENTAL MECHANICS, 2012,
  • [3] APPLICATION OF MAGNETOHYDROSTATIC SEPARATION TO METALLURGICAL PROBLEMS
    LIN, IJ
    FINKELSTEIN, NP
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1975, 76 : 111 - 112
  • [4] APPLICATION OF LOGISTIC PRINCIPLES IN METALLURGICAL PRODUCTION
    Malindzak, D.
    METALURGIJA, 2012, 51 (03): : 345 - 348
  • [5] Calibration problems with the viscosity measurement of liquid metallurgical slags
    Heller, H. P.
    Schuermann, M.
    Scholl, K.
    Haustein, N.
    Lychatz, B.
    Falkus, J.
    2ND INTERNATIONAL CONFERENCE ON RHEOLOGY AND MODELING OF MATERIALS (IC-RMM2), 2017, 790
  • [6] RISK MANAGEMENT SYSTEM IN METALLURGICAL PRODUCTION
    Karkoszka, T.
    METALURGIJA, 2021, 60 (1-2): : 133 - 136
  • [7] Optimal system analysis with cost and reliability criterion -: an application to a metallurgical plant
    Wailly, O
    Héraud, N
    Proceedings of the IEEE-ISIE 2004, Vols 1 and 2, 2004, : 879 - 882
  • [8] A fuzzy control system with application to production planning problems
    Qin, Zhongfeng
    Bai, Manying
    Ralescu, Dan
    INFORMATION SCIENCES, 2011, 181 (05) : 1018 - 1027
  • [9] IMPROVING QUALITY OF METALLURGICAL PRODUCTION AND PROBLEMS OF INDUSTRIAL LABORATORIES
    PRIDANTS.MV
    INDUSTRIAL LABORATORY, 1965, 31 (07): : 967 - &
  • [10] METALLURGICAL PROBLEMS IN NUCLEAR-POWER PRODUCTION - REPLY
    HARDY
    BALL
    MCINTOSH
    JOURNAL OF THE INSTITUTE OF METALS, 1956, 84 (12): : 480 - 482