Particle swarm optimization for resource-constrained project scheduling

被引:81
|
作者
Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong [1 ]
不详 [2 ]
机构
来源
Int. J. Proj. Manage. | 2006年 / 1卷 / 83-92期
关键词
24;
D O I
10.1016/j.ijproman.2005.06.006
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Hybrid differential evolution particle swarm optimization (DEA-DCWPSO) for resource-constrained multi-project scheduling problem
    Wang, Haixin
    Chen, Xin
    Wei, Shengsong
    Wang, Yanjie
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2022, 22 (03) : 957 - 969
  • [32] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Zhang, Hong
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 150 - 159
  • [33] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [34] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Menesi, Wail
    Hegazy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [35] Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem
    Zhang, Lieping
    Luo, Yingxiong
    Zhang, Yu
    JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2015, 2015
  • [36] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [37] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [38] Development of a method based on particle swarm optimization to solve resource constrained project scheduling problem
    Zeighami, V.
    Akbari, R.
    Ziarati, K.
    SCIENTIA IRANICA, 2013, 20 (06) : 2123 - 2137
  • [39] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [40] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174