Particle swarm optimization for resource-constrained project scheduling

被引:81
|
作者
Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong [1 ]
不详 [2 ]
机构
来源
Int. J. Proj. Manage. | 2006年 / 1卷 / 83-92期
关键词
24;
D O I
10.1016/j.ijproman.2005.06.006
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels
    Joy, Jiby
    Rajeev, Srijith
    Abraham, Eldhose C.
    MATERIALS TODAY-PROCEEDINGS, 2021, 47 : 5125 - 5129
  • [22] Particle swarm optimization for resource Constrained-project scheduling problem with varying resource levels
    Joy, Jiby
    Rajeev, Srijith
    Narayanan, Vishnu
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 948 - 954
  • [23] Critical Sequences and Resource Links Optimization in Resource-Constrained Project Scheduling
    Cui, Wan-An
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (05)
  • [24] Hybrid particle swarm optimization for solving resource-constrained FMS
    Dongyun Wang
    Progress in Natural Science, 2008, (09) : 1179 - 1183
  • [25] Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    Chen, Ruey-Maw
    Wu, Chung-Lun
    Wang, Chuin-Mu
    Lo, Shih-Tang
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (03) : 1899 - 1910
  • [26] Hybrid particle swarm optimization for solving resource-constrained FMS
    Wang, Dongyun
    Liu, Liping
    PROGRESS IN NATURAL SCIENCE-MATERIALS INTERNATIONAL, 2008, 18 (09) : 1179 - 1183
  • [27] Double-population quasi particle swarm optimization for solving resource-constrained scheduling problem
    He, Jieguang
    Chen, Xindu
    Chen, Xin
    Liu, Qiang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (09): : 2446 - 2457
  • [28] Application of Hybrid Particle Swarm Optimization in Resource Constrained Multi-project Scheduling
    Du Hui
    Lou Pei-Huang
    Ye Wen-Hua
    JOURNAL OF THE CHINESE SOCIETY OF MECHANICAL ENGINEERS, 2014, 35 (05): : 371 - 379
  • [29] Application of hybrid particle swarm optimization in resource constrained multi-project scheduling
    Du, Hui
    Lou, Pei-Huang
    Ye, Wen-Hua
    Journal of the Chinese Society of Mechanical Engineers, Transactions of the Chinese Institute of Engineers, Series C/Chung-Kuo Chi Hsueh Kung Ch'eng Hsuebo Pao, 2014, 35 (05): : 371 - 379
  • [30] An Effective Hybrid Algorithm Based on Particle Swarm Optimization with Migration Method for Solving the Multiskill Resource-Constrained Project Scheduling Problem
    Quoc, Huu Dang
    The, Loc Nguyen
    Doan, Cuong Nguyen
    APPLIED COMPUTATIONAL INTELLIGENCE AND SOFT COMPUTING, 2022, 2022