Scheduling method for single-arm cluster tools of wafer fabrications with residency and continuous reentrancy

被引:0
|
作者
Zhou, Binghai [1 ]
Wang, Zhu [1 ]
Chen, Jia [1 ]
机构
[1] School of Mechanical Engineering, Tongji University, Shanghai 201804, China
关键词
Nonlinear programming;
D O I
10.3969/j.issn.1003-7985.2013.02.014
中图分类号
学科分类号
摘要
引用
收藏
页码:187 / 193
相关论文
共 50 条
  • [41] Buffer Space Configuration and Scheduling Analysis of Single-Arm Multi-cluster Tools
    Bai, LiPing
    Wu, NaiQi
    Li, ZhiWu
    Zhou, MengChu
    2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 349 - 354
  • [42] Scheduling of Single-arm Cluster Tools with Multi-Type Wafers and Shared PMs
    Wang, Jipeng
    Pan, Chunrong
    Hu, Hesuan
    Zhou, Yuan
    2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 1046 - 1051
  • [43] Virtual Cell-Based Scheduling Approach to Single-Robotic-Arm Cluster Tools Subject to Wafer Residency Time Constraints
    Wang, Jufeng
    Liu, Chunfeng
    Zhou, MengChu
    Abusorrah, Abdullah
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 240 - 251
  • [44] Virtual Cell-Based Scheduling Approach to Single-Robotic-Arm Cluster Tools Subject to Wafer Residency Time Constraints
    Wang, Jufeng
    Liu, Chunfeng
    Zhou, MengChu
    Abusorrah, Abdullah
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 240 - 251
  • [45] Petri Net-Based Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools in Semiconductor Manufacturing
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2013, 26 (04) : 578 - 591
  • [46] How to Respond to Process Module Failure in Residency Time-Constrained Single-Arm Cluster Tools
    Qiao, Yan
    Wu, Naiqi
    Pan, ChunRong
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2014, 27 (04) : 462 - 474
  • [47] Robot Waiting Time Analysis and Its Impact on Wafer Delay Time of Single-Arm Cluster Tools
    Xiong, WenQing
    Qiao, Yan
    Wu, NaiQi
    Bai, LiPing
    Chen, MingXin
    Hsieh, PinHui
    Yin, Li
    IFAC PAPERSONLINE, 2020, 53 (04): : 384 - 389
  • [48] Scheduling of start-up process for single-arm cluster tools with chamber cleaning operations
    Guo W.-Y.
    Pan C.-R.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (02): : 303 - 310
  • [49] Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2017, 30 (03) : 261 - 269
  • [50] Schedulability and Scheduling Analysis of Dual-Arm Cluster Tools with Wafer Revisiting and Residency Time Constraints Based on a Novel Schedule
    Qiao, Yan
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (03): : 472 - 484