Demonstration of bridge type schemes for Maanshan Changjiang River Bridge under condition of complicated river pattern

被引:0
|
作者
机构
[1] Yang, Guang-Wu
来源
Yang, G.-W. (yanggw@brdi.com.cn) | 1600年 / Wuhan Bridge Research Institute卷 / 43期
关键词
Rivers - Highway bridges - Bridge cables - Cable stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
The river reaches at the site of Maanshan Changjiang River Highway Bridge are the forked reaches, of which the condition of river pattern of the reach at the site of the main bridge of the left bridge is quite complicated. Through the comprehensive analysis of the construction conditions, such as the river pattern and navigation requirements, of the site of the main bridge, five bridge type schemes (i.e. a three-tower suspension bridge with main spans 2×1080 m, a two-tower suspension bridge with a main span 1388 m, a two-pylon cable-stayed bridge with a main span 1180 m, a three-pylon cable-stayed bridge with main spans 2×850 m and a single-span suspension bridge with a main span 1760 m) put forward for the bridge were compared and demonstrated from aspects of the waterway adaptability and engineering economy. On the basis of the comparison and demonstration, it was finally determined that the scheme of the three-tower and two-span suspension bridge with main spans 2×1080 m should be chosen for the bridge. With the chosen scheme, the problem of the waterway adaptability affected by the left and right swaying of the deep channel was well resolved and the favorable conditions for the successful determining and approval of the bridge project were thus created.
引用
收藏
相关论文
共 50 条
  • [41] River Traffic Organization Schemes for Girder Construction of Main Navigational Channel Bridge of Shanghai-Suzhou-Nantong Changjiang River Rail-cum-Road Bridge
    Li, Rui-Bin
    Sun, Yong-Qiang
    Liu, Jia
    An, Yi-Ming
    Bridge Construction, 2020, 50 (04) : 112 - 117
  • [42] Control Techniques for Superstructure Construction of Wufengshan Changjiang River Bridge
    Feng, Chuan-Bao
    Bridge Construction, 2020, 50 (01) : 99 - 104
  • [43] Conception and Design of Yanji Changjiang River Bridge in Hubei Province
    Peng, Yuan-Cheng
    Ding, Shao-Ling
    Ren, Meng
    Li, Zhi-Gang
    Zhang, Wei
    Bridge Construction, 2022, 52 (03) : 1 - 7
  • [44] Study of Span Arrangement Options for Changtai Changjiang River Bridge
    Hu, Yong
    Zhao, Wei-Yang
    Bridge Construction, 2021, 51 (01) : 1 - 7
  • [45] Erection Technique for Stiffening Girder of Wufengshan Changjiang River Bridge
    Zhao, Xiao-Jing
    Yu, Xiang-Jun
    Bridge Construction, 2020, 50 (02): : 1 - 6
  • [46] Bridge Type Selection for Main Bridge of Third Yili River Bridge
    Fu X.-F.
    Chen C.-L.
    Bridge Construction, 2023, 53 : 119 - 126
  • [47] Research on Collision Protection Schemes of South Tower of South Navigation Channel Bridge of Zhangjiagang-Jingjiang-Rugao Changjiang River Bridge
    Zhang G.
    Zhang X.
    Guo H.
    Fang H.
    Bridge Construction, 2024, 54 (02) : 16 - 21
  • [49] Research on Pylon Foundation Types for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Hu, Yong
    Bridge Construction, 2021, 51 (02) : 1 - 9
  • [50] Overall Design and Concept Development for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Qin, Shun-Quan
    Xu, Wei
    Lu, Qin-Feng
    Zheng, Qing-Gang
    Fu, Zhan-Gong
    Yuan, Ren-An
    Sun, Jian-Li
    Bridge Construction, 2020, 50 (03) : 1 - 10