Demonstration of bridge type schemes for Maanshan Changjiang River Bridge under condition of complicated river pattern

被引:0
|
作者
机构
[1] Yang, Guang-Wu
来源
Yang, G.-W. (yanggw@brdi.com.cn) | 1600年 / Wuhan Bridge Research Institute卷 / 43期
关键词
Rivers - Highway bridges - Bridge cables - Cable stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
The river reaches at the site of Maanshan Changjiang River Highway Bridge are the forked reaches, of which the condition of river pattern of the reach at the site of the main bridge of the left bridge is quite complicated. Through the comprehensive analysis of the construction conditions, such as the river pattern and navigation requirements, of the site of the main bridge, five bridge type schemes (i.e. a three-tower suspension bridge with main spans 2×1080 m, a two-tower suspension bridge with a main span 1388 m, a two-pylon cable-stayed bridge with a main span 1180 m, a three-pylon cable-stayed bridge with main spans 2×850 m and a single-span suspension bridge with a main span 1760 m) put forward for the bridge were compared and demonstrated from aspects of the waterway adaptability and engineering economy. On the basis of the comparison and demonstration, it was finally determined that the scheme of the three-tower and two-span suspension bridge with main spans 2×1080 m should be chosen for the bridge. With the chosen scheme, the problem of the waterway adaptability affected by the left and right swaying of the deep channel was well resolved and the favorable conditions for the successful determining and approval of the bridge project were thus created.
引用
收藏
相关论文
共 50 条
  • [21] Study of erection schemes for steel girder of main bridge of Tongling Changjiang River rail-cum-road bridge
    Zhou, Wai-Nan
    Bridge Construction, 2014, 44 (05) : 1 - 8
  • [22] Design of main navigable span bridge of Chizhou Changjiang River Highway Bridge
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 4 (92-96):
  • [23] Pylon Design for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Zhang, Jin-Tao
    Fu, Zhan-Gong
    Qin, Shun-Quan
    Jiang, Zhen-Xiong
    Zhang, Rui
    Bridge Construction, 2022, 52 (05) : 1 - 7
  • [24] Structural Design of Main Bridge of Nanjing Xianxin Road Changjiang River Bridge
    Xiao H.
    Gao Z.
    Lu Q.
    Tang H.
    Yu J.
    Bridge Construction, 2024, 54 (02) : 1 - 7
  • [25] Key Construction Techniques for Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Xing-Hua
    Pan, Dong-Fa
    Bridge Construction, 2020, 50 (04) : 9 - 16
  • [26] Analysis and study of flutter stability of dajiang bridge of Miaozui Changjiang River Bridge
    Liu, Wei-Fang
    Zhou, Chang-Dong
    Chen, Guo-Xiang
    Dai, Ming-Jing
    Bridge Construction, 2015, 45 (05) : 72 - 76
  • [27] Overall Design of Hedong Changjiang River Bridge in Luzhou
    Ning, Bo-Wei
    Bridge Construction, 2022, 52 (04) : 110 - 116
  • [28] Key Construction Techniques for Cofferdam of Pier Z4 of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Dun L.
    Wang L.-X.
    Bridge Construction, 2023, 53 (02) : 10 - 16
  • [29] Comparison and selection of damping schemes for very long stay cables of main ship channel bridge of Hutong Changjiang River Bridge
    Chen, Wei-Xiong
    Wang, Zheng-Xing
    Wang, Bo
    Chai, Xiao-Peng
    Bridge Construction, 2015, 45 (06) : 7 - 11
  • [30] Analysis of Wind-Train-Track-Bridge Interaction for Main Bridge of Changtai Changjiang River Bridge
    Li, Xiao-Zhen
    Li, Xing-Xing
    Shu, Xiao-Feng
    Liu, De-Jun
    Bridge Construction, 2021, 51 (03) : 17 - 24