Construction control technique for high geostress tunnel in Chongqing-Guizhou railway

被引:0
|
作者
Chongqing-Guizhou Railway Co. Ltd, Chongqing [1 ]
400014, China
不详 [2 ]
401121, China
机构
来源
J. Railw. Eng. Soc. | / 11卷 / 93-97期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Deformation
引用
收藏
相关论文
共 50 条
  • [41] First application of the Pretunnel system for the construction of a tunnel in the high-speed railway line in Italy
    Brino, L
    Pagliacci, F
    Campa, E
    Pelizza, S
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 311 - 316
  • [42] Design of high speed railway tunnel and its construction method in abrupt slope with loose rockmass
    Zhou Xiaojun
    Bo, Jiang
    Rui, Yang
    Chao, Ning
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1096 - +
  • [43] Risk assessment of high-speed railway tunnel construction based on fuzzy synthetic evaluation
    Wu, Li
    Zhang, Lianggang
    Lai, Yun
    Chen, Jian
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1251 - 1256
  • [44] New technologies for high-risk tunnel construction in Guiyang-Guangzhou high-speed railway
    Zhao Y.
    Chen S.
    Tan X.
    Hui M.
    Journal of Modern Transportation, 2013, 21 (4): : 258 - 265
  • [45] Study on optimal design of disease prevention and control of tunnel bottom structure of high-speed railway tunnel
    Wang, Gexin
    Journal of Railway Science and Engineering, 2022, 19 (08) : 2133 - 2142
  • [46] Statistics and construction methods for deep TBM tunnels with high geostress: A case study of Qinling Tunnel in Hanjiang-Weihe River Diversion Project
    Han, Xingbo
    Liang, Xiaoming
    Ye, Fei
    Wang, Xin
    Chen, Ziming
    ENGINEERING FAILURE ANALYSIS, 2022, 138
  • [47] THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION
    Hu, Shimin
    Zhang, Dingli
    LISS 2011: PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE, VOL 3, 2011, : 155 - 158
  • [48] Stability Analysis of Construction Process of New Tunnel Passing through High-speed Railway Foundation
    Zhang, Fei
    Journal of Railway Engineering Society, 2022, 39 (05) : 53 - 58
  • [49] Research on construction time of secondary lining of large section loess tunnel for high-speed railway
    Lu Jun-fu
    Wang Ming-nian
    Jia Yuan-yuan
    Yu Yu
    Tan Zhong-sheng
    ROCK AND SOIL MECHANICS, 2011, 32 (03) : 843 - 848
  • [50] Research and optimization of tunnel construction scheme for super-large span high-speed railway tunnel in poor tuff strata
    Ma, Jianfei
    He, Shaohui
    Liu, Xiabing
    He, Jiaxin
    APPLIED RHEOLOGY, 2023, 33 (01)