Construction control technique for high geostress tunnel in Chongqing-Guizhou railway

被引:0
|
作者
Chongqing-Guizhou Railway Co. Ltd, Chongqing [1 ]
400014, China
不详 [2 ]
401121, China
机构
来源
J. Railw. Eng. Soc. | / 11卷 / 93-97期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Deformation
引用
收藏
相关论文
共 50 条
  • [31] Impact of Shield Tunnel Construction on Adjacent Railway Bridge: Protective Measures and Deformation Control
    Liu, Wen
    Zhao, Lu
    Yao, Xiang-Chuan
    Zheng, Hai-Ao
    Liu, Wen-Li
    Buildings, 14 (09):
  • [32] Impact of Shield Tunnel Construction on Adjacent Railway Bridge: Protective Measures and Deformation Control
    Liu, Wen
    Zhao, Lu
    Yao, Xiang-Chuan
    Zheng, Hai-Ao
    Liu, Wen-Li
    BUILDINGS, 2024, 14 (09)
  • [33] Risk Prediction of Rock Bursts and Large Deformations in YL Tunnel of the Chongqing-Kunming High-Speed Railway
    Liu, Yuxuan
    Zhang, Yuqi
    Su, Peidong
    Zhang, Guangze
    Qiu, Peng
    Tang, Lin
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [34] Development and Application of Mechanized Matching Equipment for High-Speed Railway Tunnel Construction
    Zhang, Heng
    Sun, Jianchun
    Ma, Hui
    Chen, Shougen
    Huang, Muyan
    12TH INTERNATIONAL CONFERENCE INTERDISCIPLINARITY IN ENGINEERING (INTER-ENG 2018), 2019, 32 : 952 - 959
  • [35] Application of the compensation grouting technique to control induced by tunnel boring under a railway viaduct
    Pigorini, Andrea
    Iannotta, Fausto
    Sacchi, Francesco
    Ingegneria Ferroviaria, 2010, 65 (7-8): : 653 - 668
  • [36] Application of adaptive control system in high speed railway bridge construction control
    Jiang, Alan
    Yao, Changjian
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2751 - 2755
  • [37] Oxygen Concentrating and Appilcation for Railway Tunnel Construction in High Altitude Area and It's Physiological Effects on the Construction Workers
    Liu, Ying Shu
    Wu, Tian Yi
    Ding, Shou Quan
    Liu, Wen Hai
    Hou, Qing Wen
    Feng, Jun Xiao
    Le, Kai
    Zhang, Hui
    Li, Yong Ling
    2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
  • [38] The settlement law of railway ballast beds traversed by a shield tunnel and the control of shield construction parameters
    Peng H.
    Yang Z.-W.
    Cao Q.
    Ma W.-H.
    Gongcheng Lixue/Engineering Mechanics, 2019, 36 : 222 - 228
  • [39] Tunnel Construction in a Large Landslide - Wuyi Tunnel of the High Speed Railway Line Hefei-Fuzhou, PR China
    Stingl, V.
    Neumann, P.
    Kirschner, H.
    BAUINGENIEUR, 2017, 92 : 550 - 557
  • [40] Analysis On Vibrations Due To High-speed Railway Tunnel And Control Measures
    Quan Xiaojuan
    Shi Kai
    Yan Yibo
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 381 - 386