A study on construction costs per unit area of irrigation projects

被引:3
|
作者
Koç C. [1 ]
机构
[1] Faculty of Engineering, Civil Engineering Department, Bilecik University, Bilecik
关键词
Irrigation scheme type; Turkey; Unit cost; Unproductive investment; Water supply;
D O I
10.1007/s10795-011-9120-3
中图分类号
学科分类号
摘要
The cost constructing for irrigation is often given in $/ha. In deciding whether a project is worth undertaking, it is important to weigh the anticipated benefits against the expected costs. In this study, unit area construction costs based on the way of project water supply (gravity, pump) and scheme type (classic canal, flume, pipe) were calculated for the 211 irrigation projects operated and constructed by DSI (State Hydraulic Works) in Turkey. In a case study of the 27 irrigation schemes constructed by DSI in the Büyük Menderes and West Mediterranean basins, construction costs per unit area, irrigation ratio, and amount of unproductive costs were determined. As a result, though the area of 76383 ha was constructed for irrigation schemes, this area wasn't under irrigation services with several various reasons; therefore, 641 million $US according to water supply way, and 574 million $US to the scheme type were unproductive investment for irrigation projects researched in the basins. © 2011 Springer Science+Business Media B.V.
引用
收藏
页码:255 / 263
页数:8
相关论文
共 50 条
  • [11] The calculation of acceleration costs on construction projects
    Maritz, Tinus
    Schutte, Andries
    ACTA STRUCTILIA, 2009, 16 (02) : 86 - 102
  • [12] DISCOUNTED AND PER UNIT COSTS OF PRODUCT WARRANTY
    MAMER, JW
    MANAGEMENT SCIENCE, 1987, 33 (07) : 916 - 930
  • [13] Methodology for monitoring quality costs in the design of construction projects: Case study
    Alonso Dzul-Lopez, Luis
    Gracia-Villar, Santos
    Gonzalez-Benitez, Margarita
    Fernandez-Diez, Federico
    Cremades-Oliver, Lazaro
    DYNA, 2010, 85 (01): : 47 - 60
  • [14] A study of magnetic charge per unit area of dipole model for the NDE
    Hwang, Jiseong
    Jun, Jongwoo
    Choi, Seho
    Kim, Cheolwoong
    Ogawa, Kazuhiro
    Lee, Jinyi
    PROGRESSES IN FRACTURE AND STRENGTH OF MATERIALS AND STRUCTURES, 1-4, 2007, 353-358 : 2371 - +
  • [15] Investigating the overhead costs in construction projects in Palestine
    Enshassi, Adnan
    Aziz, Abdul
    El Karriri, Ala'a
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2008, 13 (01) : 35 - +
  • [16] Factors That Affect Transaction Costs in Construction Projects
    Li, Huimin
    Arditi, David
    Wang, Zhuofu
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 60 - 68
  • [17] Transaction costs in construction projects under uncertainty
    Guo, Lei
    Li, Huimin
    Li, Peng
    Zhang, Chengyi
    KYBERNETES, 2016, 45 (06) : 866 - 883
  • [18] Delay factors in the construction of irrigation and hydropower projects in Vietnam
    Nguyen, Van Son
    Nguyen, Huu-Hue
    Nguyen, Duc Anh
    Hai, Dinh Tuan
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 5 - 20
  • [19] MOISTURE CONTENT IN WEIGHT PER UNIT AREA
    BOLIN, G
    PAPIER, 1968, 22 (07): : 409 - &
  • [20] Are gel blasters a safe toy? A study into their kinetic energy per unit area
    Oehm, Samantha
    Howe, Greg
    Dutton, Gerard
    Arthur, Isaac
    FORENSIC SCIENCE INTERNATIONAL, 2024, 361