A Whole-Process Data Processing Method for Tunnel Seismic Geological Prediction Ahead of Tunnel Faces

被引:0
|
作者
Cuifa Shao [1 ]
Yanning Wang [2 ]
Yunfu Jia [3 ]
Feng Liang [3 ]
Chengyuan Pei [4 ]
Peng Guan [1 ]
Yuyong Jiao [1 ]
机构
[1] Faculty of Engineering, China University of Geosciences
[2] Tianjin Municipal Engineering Design & Research Institute
[3] Xinjiang Survey and Design Institute for Water Resources and Hydropower
[4] Xinjiang Water Conservancy Development and Construction Group Co,
关键词
D O I
暂无
中图分类号
U452.11 [];
学科分类号
摘要
<正>0 INTRODUCTION The forecast of abnormal geological structures(e.g., fracture zones, faults, aquifers and karst) during tunnel drilling remains a demanding task: detecting faults and other geological features impacting the area ahead of the tunnel is crucial for safety and engineering considerations(Meng et al., 2024; Wu et al., 2024).
引用
收藏
页码:333 / 338
页数:6
相关论文
共 50 条
  • [1] A Whole-Process Data Processing Method for Tunnel Seismic Geological Prediction Ahead of Tunnel Faces
    Shao, Cuifa
    Wang, Yanning
    Jia, Yunfu
    Liang, Feng
    Pei, Chengyuan
    Guan, Peng
    Jiao, Yuyong
    JOURNAL OF EARTH SCIENCE, 2025, 36 (01) : 333 - 338
  • [2] Seismic prediction of geological structures ahead of the tunnel using tunnel surface waves
    Jetschny, Stefan
    Bohlen, Thomas
    Kurzmann, Andre
    GEOPHYSICAL PROSPECTING, 2011, 59 (05) : 934 - 946
  • [3] The integrated prediction system for geological conditions ahead of tunnel faces
    Shirasagi, S.
    Yamamoto, T.
    Mito, Y.
    Ashraf, M.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1809 - 1812
  • [4] A prediction method of potential failure zones ahead of tunnel faces
    Tai Q.
    Zhang D.
    Fang Q.
    Li A.
    Gao J.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2016, 35 (05): : 1009 - 1018
  • [5] Whole-process risk management of subsea tunnel engineering
    Yang, Wen Wu
    Tsang, Chor Kin
    Cai, Yu Xuan
    Hu, Yue-Ming
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2020, 173 (01) : 27 - 34
  • [6] Tunnel seismic tomography method for geological prediction and its application
    Yonggui Zhao
    Hui Jiang
    Xiaopeng Zhao
    Applied Geophysics, 2006, 3 (2) : 69 - 74
  • [7] Seismic velocity prediction ahead of the tunnel face using seismic refraction with a source in the tunnel
    Takahashi, T
    Hayashi, K
    Contribution of Rock Mechanics to the New Century, Vols 1 and 2, 2004, : 109 - 114
  • [8] Evaluation of geological conditions ahead of a tunnel face using the Tunnel Seismic Prediction method (TSP) - Lesson learned from the Pahang-Selangor raw water transfer tunnel, Malaysia
    Ismail, M. A. M.
    Azit, R.
    Ng, S. M.
    Zabidi, H.
    Bakhudin, N.
    Nordin, Z.
    ROCK MECHANICS FOR RESOURCES, ENERGY AND ENVIRONMENT, 2013, : 901 - 907
  • [9] Systems for forward prediction of geological condition ahead of the tunnel face
    Yamamoto, T
    Shirasagi, S
    Inou, M
    Aoki, K
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 237 - 242
  • [10] A Polarization Migration Velocity Model Building Method for Geological Prediction Ahead of the Tunnel Face
    Wang, Bo
    Huang, Lanying
    FRONTIERS IN EARTH SCIENCE, 2022, 10