Numerical simulation and application of phased cut blasting in hard rock Roadway in metal mine

被引:0
|
作者
He, Songlin [1 ]
Yang, Renshu [1 ,2 ]
Ding, Chenxi [1 ]
Wang, Lijun [3 ]
Yan, Zhenxiang [3 ]
Chen, Jianhua [3 ]
Liu, Zhen [1 ]
Liu, Sen [3 ]
Wang, Xuewen [3 ]
机构
[1] School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing,100083, China
[2] State Key Laboratory for Geo Mechanics & Deep Underground Engineering, Beijing,100083, China
[3] Shougang Mining Company, Qian'an,064400, China
关键词
Detonation - Dredges - Dredging - Iron mines - Mixed reality - Slotting - Trenching - Tunneling (excavation);
D O I
10.12438/cst.2023-0205
中图分类号
学科分类号
摘要
In response to the challenges of high rock strength in deep underground metal mines, difficulty in slotting, and low efficiency in excavation, based on the tunneling project at Xingshan Underground Iron Mine of Shougang Corporation, and utilizing precise per-hole blasting with digital electronic detonators, we propose a phased blasting scheme for slotting areas of straight-eye barrel-shaped grooves, combining segmentation within and between holes, as well as delays within each hole. In combination with numerical simulations and field tests, it presents a trench domain gradient detonation configuration with differential detonation in the hole area, between holes and within holes on the basis of the original conventional scheme, builds a three-dimensional(3D) model of the trench domain μsing LS-DYNA numerical simulation software, sets up the original conventional scheme and three gradient schemes for modelling, and provides a comparative analysis of the evolution of the effective peak stress in the dredged-trench zone for the original conventional blasting solution and the staged solution. The results of the numerical simulations show that the μse of short-delay inter-hole blasting can change the fluctuation pattern of the peak effective stress, and compared to the original conventional scheme, the peak effective stress state of the rock in the dredged-trench zone along the direction of the shell hole is increased by 40% to 57%, while the peak effective stress state of the rock in the radiμs of 0-30cm at the bottom of the shell hole is increased by 84% to 92%. In addition to the numerical simulation results, field experiments were carried out to verify the results. It is clear that the combination of short-delay differential detonation between holes can improve debris crowding in mine excavation, and short-delay differential detonation within holes can improve throwing capacity, improve debris throwing after blasting in the upper part of the shell hole, and avoid affecting the blasting of subsequent shell holes. Incorporating the two in hard rock blasting can significantly improve the blasting effect and increase the hollowing progress by 28%. And better results can be obtained in rock point-excavation by μsing short delay between holes and long delay within hole settings. The results of this paper could provide a reference for similar mine production. © 2024 China Coal Society. All rights reserved.
引用
收藏
页码:37 / 46
相关论文
共 50 条
  • [31] Numerical simulation of rock blasting in jointed rock mass by DDA method
    Ning You-jun
    Yang Jun
    Chen Peng-wan
    ROCK AND SOIL MECHANICS, 2010, 31 (07) : 2259 - 2263
  • [32] Numerical simulation of blasting-induced rock fractures
    Ma, G. W.
    An, X. M.
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2008, 45 (06) : 966 - 975
  • [33] Novel blasting techniques for productivity improvement in hard rock underground dolostone mine
    Ramulu, M.
    Rao, K. R.
    BLASTING IN MINES - NEW TRENDS, 2013, : 61 - 67
  • [34] The Dynamic Effect Analysis of Transient Unloading Due to Blasting Excavation in in Deep and Hard Rock Roadway
    Guo, Jun
    Gan, De-qing
    Tan, Jing
    Lv, Gui-lin
    MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 682 - +
  • [35] PHYSICAL SCALE MODELLING OF ROADWAY ADVANCE WITH WEDGE CUT BLASTING FOR SOUTH WING RAIL AT TUNLIU MINE
    Yu, Y. Q.
    Mitri, H. S.
    PROCEEDINGS OF THE 2012 COAL OPERATORS' CONFERENCE, 2012, : 170 - +
  • [36] Numerical simulation of parallel hole cut blasting with uncharged holes
    Shijie Qu Xiangbin Zheng Lihua Fan Ying Wang School of Civil and Environmental Engineering
    Journal of University of Science and Technology Beijing, 2008, (03) : 209 - 214
  • [37] Numerical simulation of parallel hole cut blasting with uncharged holes
    Qu, Shijie
    Zheng, Xiangbin
    Fan, Lihua
    Wang, Ying
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2008, 15 (03): : 209 - 214
  • [38] Numerical simulation of blasting through strata for gas drainage in Nantong coal mine and its application
    Gong Min
    Wen Bin
    Wang De-sheng
    ROCK AND SOIL MECHANICS, 2012, 33 (06) : 1822 - 1828
  • [39] Numerical simulation study on hard-thick roof inducing rock burst in coal mine
    Jiang He
    Lin-ming Dou
    Zong-long Mu
    An-ye Cao
    Si-yuan Gong
    Journal of Central South University, 2016, 23 : 2314 - 2320
  • [40] Numerical simulation study on hard-thick roof inducing rock burst in coal mine
    He Jiang
    Dou Lin-ming
    Mu Zong-long
    Cao An-ye
    Gong Si-yuan
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2016, 23 (09) : 2314 - 2320