Numerical simulation and application of phased cut blasting in hard rock Roadway in metal mine

被引:0
|
作者
He, Songlin [1 ]
Yang, Renshu [1 ,2 ]
Ding, Chenxi [1 ]
Wang, Lijun [3 ]
Yan, Zhenxiang [3 ]
Chen, Jianhua [3 ]
Liu, Zhen [1 ]
Liu, Sen [3 ]
Wang, Xuewen [3 ]
机构
[1] School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing,100083, China
[2] State Key Laboratory for Geo Mechanics & Deep Underground Engineering, Beijing,100083, China
[3] Shougang Mining Company, Qian'an,064400, China
关键词
Detonation - Dredges - Dredging - Iron mines - Mixed reality - Slotting - Trenching - Tunneling (excavation);
D O I
10.12438/cst.2023-0205
中图分类号
学科分类号
摘要
In response to the challenges of high rock strength in deep underground metal mines, difficulty in slotting, and low efficiency in excavation, based on the tunneling project at Xingshan Underground Iron Mine of Shougang Corporation, and utilizing precise per-hole blasting with digital electronic detonators, we propose a phased blasting scheme for slotting areas of straight-eye barrel-shaped grooves, combining segmentation within and between holes, as well as delays within each hole. In combination with numerical simulations and field tests, it presents a trench domain gradient detonation configuration with differential detonation in the hole area, between holes and within holes on the basis of the original conventional scheme, builds a three-dimensional(3D) model of the trench domain μsing LS-DYNA numerical simulation software, sets up the original conventional scheme and three gradient schemes for modelling, and provides a comparative analysis of the evolution of the effective peak stress in the dredged-trench zone for the original conventional blasting solution and the staged solution. The results of the numerical simulations show that the μse of short-delay inter-hole blasting can change the fluctuation pattern of the peak effective stress, and compared to the original conventional scheme, the peak effective stress state of the rock in the dredged-trench zone along the direction of the shell hole is increased by 40% to 57%, while the peak effective stress state of the rock in the radiμs of 0-30cm at the bottom of the shell hole is increased by 84% to 92%. In addition to the numerical simulation results, field experiments were carried out to verify the results. It is clear that the combination of short-delay differential detonation between holes can improve debris crowding in mine excavation, and short-delay differential detonation within holes can improve throwing capacity, improve debris throwing after blasting in the upper part of the shell hole, and avoid affecting the blasting of subsequent shell holes. Incorporating the two in hard rock blasting can significantly improve the blasting effect and increase the hollowing progress by 28%. And better results can be obtained in rock point-excavation by μsing short delay between holes and long delay within hole settings. The results of this paper could provide a reference for similar mine production. © 2024 China Coal Society. All rights reserved.
引用
收藏
页码:37 / 46
相关论文
共 50 条
  • [21] A Study on Cut Blasting with Large Diameter Charges in Hard Rock Roadways
    Cheng, Bing
    Wang, Haibo
    Zong, Qi
    Xu, Ying
    Wang, MengXiang
    Zheng, Qiangqiang
    Li, Chengjie
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [22] Study on short distance pin point blasting technology in mine rock roadway excavation
    Tang, Deyu
    Coal Science and Technology (Peking), 1994, 22 (07):
  • [23] Experimental Study on Deep Hole Blasting of Hard Rock in Mine Shaft
    Zhang, Yiping
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 3048 - 3050
  • [24] Numerical Simulation of Coupling Support for High-Stress Fractured Soft Rock Roadway in Deep Mine
    Yuan, Wenhua
    Hong, Ke
    Liu, Run
    Ji, Lianjie
    Meng, Long
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [25] Numerical Simulation Research on deep soft rock roadway
    Zhang, Bin
    Yu, Xianglian
    Liu, Ning
    Zhu, Feng
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1439 - +
  • [26] Numerical Simulation Study on Dust Suppression Mechanism of Burning Rock Blasting in Open-Pit Mine
    Jia, ZhengZhao
    Song, ZiLing
    Fan, JunFu
    Jiang, JuYu
    Guo, ShuPeng
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [27] Research on testing and controlling techniques of millisecond delay blasting vibration in coal mine rock roadway
    Han, Bo
    Ma, Qin-Yong
    Meitan Xuebao/Journal of the China Coal Society, 2013, 38 (02): : 209 - 214
  • [28] Study on the Deformation Mechanism of Soft Rock Roadway under Blasting Disturbance in Baoguo Iron Mine
    Jing, Hong-di
    Li, Yuan-hui
    Li, Kun-meng
    SHOCK AND VIBRATION, 2018, 2018
  • [29] Mechanism of crack arrest by peripheral holes during mine rock roadway excavation under blasting
    Li M.
    Zhu Z.-M.
    Xiao D.-J.
    Hu R.
    Shi Z.-B.
    Zhu, Zhe-Ming (zhuzm1965@163.com), 1691, China Coal Society (42): : 1691 - 1699
  • [30] A numerical Approach for simulation of rock fracturing in engineering Blasting
    Saharan, Mani Ram
    Mitri, Hani S.
    INTERNATIONAL JOURNAL OF GEOTECHNICAL EARTHQUAKE ENGINEERING, 2010, 1 (02) : 38 - 58