共 50 条
- [41] Optimization of cable preloading on cable-stayed bridges SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS - SMART STRUCTURES AND MATERIALS 1997, 1997, 3043 : 248 - 259
- [42] Cable painting robot for cable-stayed bridges PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2007, VOLS 1 AND 2, 2007, : 611 - 616
- [43] Three-step method for damage detection of long span cable-stayed bridges Gongcheng Lixue, 2006, 8 (53-56+41):
- [44] Collapse Pattern Identification for Cable-stayed Bridges Based on Ultimate Limit Analysis VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT I, PTS 1-3, 2012, 105-107 : 1149 - 1158
- [46] Damping Parameter Identification of Large Span Cable-stayed Bridges INTELLIGENT STRUCTURE AND VIBRATION CONTROL, PTS 1 AND 2, 2011, 50-51 : 998 - +
- [48] Identification of the operational condition for long span cable-stayed bridges PROCEEDINGS OF INTERNATIONAL CONFERENCE ON HEALTH MONITORING OF STRUCTURE, MATERIALS AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 263 - 267
- [50] Dynamic testing of cable-stayed bridges STRUCTURAL ENGINEERING IN THE 21ST CENTURY, 1999, : 324 - 327