Optimization of Enterprise Production Programs Taking Into Account Uncertainty

被引:0
|
作者
Borisov, I. A. [1 ]
Kosorukov, O. A. [2 ]
Mishchenko, A. V. [1 ]
Tsurkov, V. I. [3 ]
机构
[1] Financial Univ Govt Russian Federat, Moscow 125167, Russia
[2] Plekhanov Russian Econ Univ, Moscow State Univ, Russian Presidential Acad Natl Econ & Publ Adm, Moscow 119991, Russia
[3] Russian Acad Sci, Fed Res Ctr Comp Sci & Control, Moscow 119333, Russia
基金
俄罗斯科学基金会;
关键词
production program; branch-and-bound method; production expansion; stability analysis; MINIMAX; MODELS;
D O I
10.1134/S1064230724700485
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The branch-and-bound method used to select the optimal production program is considered, based on the calculation of the upper, lower, and current upper estimates when analyzing various variants for production programs. An upper bound for the number of feasible solutions to the problem under consideration is given. Models for choosing the optimal production program in conditions of production expansion are considered, as well as issues of analyzing the stability of these programs when changing the initial data of the model and when changing the criterion for the optimality of the model. The use of models for selecting the optimal production program within the framework of project management at enterprises will ensure increased efficiency of activities, including at the stages of planning and implementation of projects, as well as classification and selection of a method for implementing projects.
引用
收藏
页码:663 / 678
页数:16
相关论文
共 50 条
  • [32] Choice of the Scheduling Technique Taking into Account the Subcontracting Optimization
    Aksyonov, Konstantin
    Antonova, Anna
    Goncharova, Natalia
    ADVANCES IN SIGNAL PROCESSING AND INTELLIGENT RECOGNITION SYSTEMS, 2018, 678 : 297 - 304
  • [33] Optimization of the Shape of a Penetrator Taking into Account Plug Formation
    G. Ben-Dor
    A. Dubinsky
    T. Elperin
    International Journal of Fracture, 2000, 106 (3) : 29 - 34
  • [34] Optimization of heat exchanger design taking corrosion into account
    Faes, W.
    Van Bael, J.
    Lecompte, S.
    Verbeken, K.
    De Paepe, M.
    THERMAL SCIENCE AND ENGINEERING PROGRESS, 2022, 30
  • [35] IDENTIFICATION OF PENDULOUS ACCELEROMETER MATHEMATICAL MODEL TAKING INTO ACCOUNT PARAMETRIC UNCERTAINTY
    Nikiforov, V. M.
    Gusev, A. A.
    Zolotukhin, S. S.
    Zhukova, T. A.
    Nizhegorodov, A. A.
    2017 24TH SAINT PETERSBURG INTERNATIONAL CONFERENCE ON INTEGRATED NAVIGATION SYSTEMS (ICINS), 2017,
  • [36] Verification of the Indicating Measuring Instruments Taking into Account their Instrumental Measurement Uncertainty
    Zakharov, Igor
    Neyezhmakov, Pavel
    Botsiura, Olesia
    MEASUREMENT SCIENCE REVIEW, 2017, 17 (06): : 269 - 272
  • [37] Ultimate strength of stiffened panels assesment taking into account model uncertainty
    Toderan, C.
    Richir, T.
    Caprace, J. D.
    Rigo, Ph.
    Proceedings of the 25th International Conference on Offshore Mechanics and Arctic Engineering, Vol 3, 2006, : 761 - 769
  • [38] Approaches to the Evaluation of Conformity Taking into Account the Uncertainty of the Value of the Monitored Parameter
    Volodarsky, E. T.
    Kosheva, L. O.
    Klevtsova, M. O.
    2019 IEEE 8TH INTERNATIONAL CONFERENCE ON ADVANCED OPTOELECTRONICS AND LASERS (CAOL), 2019, : 648 - 652
  • [39] ON FUNDAMENTAL CONCEPT OF STRUCTURAL COLLAPSE SIMULATION TAKING INTO ACCOUNT UNCERTAINTY PHENOMENA
    Hartmann, D.
    Breidt, M.
    Nguyen, V.
    Stangenberg, F.
    Hoehler, S.
    Schweizerhof, K.
    Mattern, S.
    Blankenhorn, G.
    Moeller, B.
    Liebscher, M.
    DAMAGE ASSESSMENT AND RECONSTRUCTION AFTER WAR OR NATURAL DISASTER, 2009, : 169 - +
  • [40] An Upgridding Technique for Geocellular Models, Taking into Account the Uncertainty of Reservoir Parameters
    S. P. Rodionov
    V. P. Kosyakov
    E. N. Musakaev
    Lobachevskii Journal of Mathematics, 2020, 41 : 1289 - 1294