Optimization of Enterprise Production Programs Taking Into Account Uncertainty

被引:0
|
作者
Borisov, I. A. [1 ]
Kosorukov, O. A. [2 ]
Mishchenko, A. V. [1 ]
Tsurkov, V. I. [3 ]
机构
[1] Financial Univ Govt Russian Federat, Moscow 125167, Russia
[2] Plekhanov Russian Econ Univ, Moscow State Univ, Russian Presidential Acad Natl Econ & Publ Adm, Moscow 119991, Russia
[3] Russian Acad Sci, Fed Res Ctr Comp Sci & Control, Moscow 119333, Russia
基金
俄罗斯科学基金会;
关键词
production program; branch-and-bound method; production expansion; stability analysis; MINIMAX; MODELS;
D O I
10.1134/S1064230724700485
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The branch-and-bound method used to select the optimal production program is considered, based on the calculation of the upper, lower, and current upper estimates when analyzing various variants for production programs. An upper bound for the number of feasible solutions to the problem under consideration is given. Models for choosing the optimal production program in conditions of production expansion are considered, as well as issues of analyzing the stability of these programs when changing the initial data of the model and when changing the criterion for the optimality of the model. The use of models for selecting the optimal production program within the framework of project management at enterprises will ensure increased efficiency of activities, including at the stages of planning and implementation of projects, as well as classification and selection of a method for implementing projects.
引用
收藏
页码:663 / 678
页数:16
相关论文
共 50 条
  • [21] TAKING INTO ACCOUNT THE UNCERTAINTY OF THE IONISATION CHAMBER POSITIONING IN IMRT VERIFICATIONS
    Richart Sancho, J.
    Perez-Calatayud, J.
    Rodriguez Villalba, S.
    Santos, M.
    Ballester, F.
    Granero, D.
    Lliso, F.
    Carmona, V.
    RADIOTHERAPY AND ONCOLOGY, 2009, 92 : S217 - S217
  • [22] The uncertainty of the measurement of temperature and temperature difference taking correlation into account
    N. P. Moiseeva
    Measurement Techniques, 2011, 53
  • [23] THE UNCERTAINTY OF THE MEASUREMENT OF TEMPERATURE AND TEMPERATURE DIFFERENCE TAKING CORRELATION INTO ACCOUNT
    Moiseeva, N. P.
    MEASUREMENT TECHNIQUES, 2011, 53 (11) : 1249 - 1255
  • [24] Surface fitting taking into account uncertainty structure in coordinate data
    Forbes, A
    MEASUREMENT SCIENCE AND TECHNOLOGY, 2006, 17 (03) : 553 - 558
  • [25] DEVELOPMENT OF THE ENTERPRISE DISTRIBUTION SYSTEM TAKING INTO ACCOUNT THE REGIONAL LOGISTICS POTENTIAL
    Anatoliivna, Bilovodska Olena
    Fedorivna, Gryshchenko Olena
    Oleksiivna, Syhyda Liubov
    MARKETING AND MANAGEMENT OF INNOVATIONS, 2016, (02): : 73 - 79
  • [26] Optimization of data collection taking radiation damage into account
    Bourenkov, Gleb P.
    Popov, Alexander N.
    ACTA CRYSTALLOGRAPHICA SECTION D-STRUCTURAL BIOLOGY, 2010, 66 : 409 - 419
  • [27] Optimization of the shape of a penetrator taking into account plug formation
    Ben-Dor, G
    Dubinsky, A
    Elperin, T
    INTERNATIONAL JOURNAL OF FRACTURE, 2000, 106 (03) : L31 - L36
  • [28] Optimization of a gearbox taking into account dynamic performance and assemblability
    Eremeev, P.
    Melckenbeeck, I
    De Cock, A.
    Devriendt, H.
    Desmet, W.
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING (ISMA2020) / INTERNATIONAL CONFERENCE ON UNCERTAINTY IN STRUCTURAL DYNAMICS (USD2020), 2020, : 2753 - 2762
  • [29] Optimization of heat exchanger design taking corrosion into account
    Faes, W.
    Van Bael, J.
    Lecompte, S.
    Verbeken, K.
    De Paepe, M.
    Thermal Science and Engineering Progress, 2022, 30
  • [30] A microcantilever chemical sensors optimization by taking into account losses
    Lochon, Frederic
    Dufour, Isabelle
    Rebiere, Dominique
    SENSORS AND ACTUATORS B-CHEMICAL, 2006, 118 (1-2) : 292 - 296