An analytical two-stage risk analysis model in the real-time reservoir operation

被引:1
|
作者
Gong, Yu [1 ,2 ,3 ]
Liu, Pan [2 ,3 ]
Liu, Dedi [2 ,3 ]
Zhang, Xiaoqi [2 ,3 ]
Xu, Weifeng [2 ,3 ]
Xiang, Daifeng [2 ,3 ]
机构
[1] Inner Mongolia Agr Univ, Sch Water Conservancy & Civil Engn, Hohhot 010018, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Peoples R China
[3] Hubei Prov Collaborat Innovat Ctr Water Resources, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
Forecast horizon; Copula method; Reservoir operation uncertainty; Multinormal distribution; Three Gorges Reservoir; FLOOD-CONTROL OPERATION; UNCERTAINTY ANALYSIS; RULES;
D O I
10.1016/j.jhydrol.2024.132256
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flood risk analysis is vital for real-time reservoir operation. The reservoir operation horizon (OH) is generally longer than the streamflow forecast horizon (FH), while the gap between the FH and the OH was seldom considered in analytical flood risk models. This study develops an analytical two-stage risk model covering the period within the FH (the first stage) and from the FH to the OH (the second stage). In the first stage, the errors in forecasted streamflow and reservoir water level-storage relationships are considered using the multinormal distribution within the FH. In the second stage, design flood hydrographs are used to estimate the flood risk by conducting reservoir routing. Finally, the total flood risk is calculated by using the copula method to combine the flood risks from the first and second stages. Results for a case study using China's Three Gorges Reservoir indicate that an effective FH can be identified to minimize flood risk, and balance between the forecast accuracy and length of the horizon. The length of the effective FH is not fixed and depends on reservoir inflow. Moreover, larger errors will not always lead to greater flood risks. The proposed method provides useful information on flood risk for real-time reservoir operation.
引用
收藏
页数:15
相关论文
共 50 条
  • [42] Real-time order flowtime estimation methods for two-stage hybrid flowshops
    Lee, Geun-Cheol
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 42 (01): : 1 - 8
  • [43] Optimal control of two-stage discrete event systems with real-time constraints
    Mao, Jianfeng
    Cassandras, Christos G.
    WODES 2006: EIGHTH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS, PROCEEDINGS, 2006, : 125 - +
  • [44] Optimal Control of Two-Stage Discrete Event Systems with Real-Time Constraints
    Jianfeng Mao
    Christos G. Cassandras
    Discrete Event Dynamic Systems, 2007, 17 : 505 - 529
  • [45] Two-Stage Refinement of Magnitude and Complex Spectra for Real-Time Speech Enhancement
    Lee, Jinyoung
    Kang, Hong-Goo
    IEEE SIGNAL PROCESSING LETTERS, 2022, 29 : 2188 - 2192
  • [46] Two-stage and real-time scheduling algorithm for convergecast in wireless sensor networks
    Zhang, Xiao-Ling
    Liang, Wei
    Yu, Hai-Bin
    Kongzhi yu Juece/Control and Decision, 2012, 27 (05): : 761 - 767
  • [47] Optimal control of two-stage discrete event systems with real-time constraints
    Mao, Jianfeng
    Cassandras, Christos G.
    DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, 2007, 17 (04): : 505 - 529
  • [48] Real-time transaction processing using two-stage validation in broadcast disks
    Lam, KW
    Lee, VCS
    Son, SH
    PARALLEL AND DISTRIBUTED PROCESSING, PROCEEDINGS, 2000, 1800 : 713 - 719
  • [49] A two-stage method for real-time baseline drift compensation in gas sensors
    Zhang, Chao
    Wang, Wen
    Pan, Yong
    Cheng, Lina
    Zhai, Shoupei
    Gao, Xu
    MEASUREMENT SCIENCE AND TECHNOLOGY, 2022, 33 (04)
  • [50] Real-Time Camera Tampering Detection Using Two-Stage Scene Matching
    Shih, Chao-Ching
    Chen, Shen-Chi
    Hung, Cheng-Feng
    Chen, Kuan-Wen
    Lin, Shih-Yao
    Lin, Chih-Wei
    Hung, Yi-Ping
    2013 IEEE INTERNATIONAL CONFERENCE ON MULTIMEDIA AND EXPO (ICME 2013), 2013,