An analytical two-stage risk analysis model in the real-time reservoir operation

被引:1
|
作者
Gong, Yu [1 ,2 ,3 ]
Liu, Pan [2 ,3 ]
Liu, Dedi [2 ,3 ]
Zhang, Xiaoqi [2 ,3 ]
Xu, Weifeng [2 ,3 ]
Xiang, Daifeng [2 ,3 ]
机构
[1] Inner Mongolia Agr Univ, Sch Water Conservancy & Civil Engn, Hohhot 010018, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Peoples R China
[3] Hubei Prov Collaborat Innovat Ctr Water Resources, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
Forecast horizon; Copula method; Reservoir operation uncertainty; Multinormal distribution; Three Gorges Reservoir; FLOOD-CONTROL OPERATION; UNCERTAINTY ANALYSIS; RULES;
D O I
10.1016/j.jhydrol.2024.132256
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flood risk analysis is vital for real-time reservoir operation. The reservoir operation horizon (OH) is generally longer than the streamflow forecast horizon (FH), while the gap between the FH and the OH was seldom considered in analytical flood risk models. This study develops an analytical two-stage risk model covering the period within the FH (the first stage) and from the FH to the OH (the second stage). In the first stage, the errors in forecasted streamflow and reservoir water level-storage relationships are considered using the multinormal distribution within the FH. In the second stage, design flood hydrographs are used to estimate the flood risk by conducting reservoir routing. Finally, the total flood risk is calculated by using the copula method to combine the flood risks from the first and second stages. Results for a case study using China's Three Gorges Reservoir indicate that an effective FH can be identified to minimize flood risk, and balance between the forecast accuracy and length of the horizon. The length of the effective FH is not fixed and depends on reservoir inflow. Moreover, larger errors will not always lead to greater flood risks. The proposed method provides useful information on flood risk for real-time reservoir operation.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] The development of a real-time flooding operation model in the Tseng-Wen Reservoir
    Chen, Yu-Wen
    Tsai, Jul-Pin
    Chang, Liang-Cheng
    Ho, Chih-Chao
    Chen, You-Cheng
    HYDROLOGY RESEARCH, 2014, 45 (03): : 490 - 503
  • [32] COMPARISON OF REAL-TIME RESERVOIR-OPERATION TECHNIQUES
    YANG, XL
    PARENT, E
    MICHEL, C
    ROCHE, PA
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1995, 121 (05) : 345 - 351
  • [33] A NEW METHOD FOR THE REAL-TIME OPERATION OF RESERVOIR SYSTEMS
    GEORGAKAKOS, AP
    MARKS, DH
    WATER RESOURCES RESEARCH, 1987, 23 (07) : 1376 - 1390
  • [34] REAL-TIME MANAGEMENT MODELS FOR IMPROVING RESERVOIR OPERATION
    RASID, H
    CAN, EK
    CANADIAN GEOGRAPHER-GEOGRAPHE CANADIEN, 1986, 30 (04): : 350 - 357
  • [35] Real-Time Operation of Reservoir System by Genetic Programming
    E. Fallah-Mehdipour
    O. Bozorg Haddad
    M. A. Mariño
    Water Resources Management, 2012, 26 : 4091 - 4103
  • [36] OPTIMIZATION OF REAL-TIME OPERATION OF A MULTIPLE RESERVOIR SYSTEM
    BECKER, L
    YEH, WWG
    TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1974, 55 (04): : 250 - 250
  • [37] Real-Time Operation of Reservoir System by Genetic Programming
    Fallah-Mehdipour, E.
    Bozorg-Haddad, Omid
    Marino, M. A.
    WATER RESOURCES MANAGEMENT, 2012, 26 (14) : 4091 - 4103
  • [38] Intelligent control for modelling of real-time reservoir operation
    Chang, LC
    Chang, FJ
    HYDROLOGICAL PROCESSES, 2001, 15 (09) : 1621 - 1634
  • [39] A hierarchical two-stage energy management for a home microgrid using model predictive and real-time controllers
    Elkazaz, Mahmoud
    Sumner, Mark
    Naghiyev, Eldar
    Pholboon, Seksak
    Davies, Richard
    Thomas, David
    APPLIED ENERGY, 2020, 269
  • [40] Two-stage Real-time Track Correlation Algorithm Based on Gray Correlation
    Jin, Bingyang
    Liu, Zheng
    Qin, Jikai
    Binggong Xuebao/Acta Armamentarii, 2020, 41 (07): : 1330 - 1338