An analytical two-stage risk analysis model in the real-time reservoir operation

被引:1
|
作者
Gong, Yu [1 ,2 ,3 ]
Liu, Pan [2 ,3 ]
Liu, Dedi [2 ,3 ]
Zhang, Xiaoqi [2 ,3 ]
Xu, Weifeng [2 ,3 ]
Xiang, Daifeng [2 ,3 ]
机构
[1] Inner Mongolia Agr Univ, Sch Water Conservancy & Civil Engn, Hohhot 010018, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Peoples R China
[3] Hubei Prov Collaborat Innovat Ctr Water Resources, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
Forecast horizon; Copula method; Reservoir operation uncertainty; Multinormal distribution; Three Gorges Reservoir; FLOOD-CONTROL OPERATION; UNCERTAINTY ANALYSIS; RULES;
D O I
10.1016/j.jhydrol.2024.132256
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flood risk analysis is vital for real-time reservoir operation. The reservoir operation horizon (OH) is generally longer than the streamflow forecast horizon (FH), while the gap between the FH and the OH was seldom considered in analytical flood risk models. This study develops an analytical two-stage risk model covering the period within the FH (the first stage) and from the FH to the OH (the second stage). In the first stage, the errors in forecasted streamflow and reservoir water level-storage relationships are considered using the multinormal distribution within the FH. In the second stage, design flood hydrographs are used to estimate the flood risk by conducting reservoir routing. Finally, the total flood risk is calculated by using the copula method to combine the flood risks from the first and second stages. Results for a case study using China's Three Gorges Reservoir indicate that an effective FH can be identified to minimize flood risk, and balance between the forecast accuracy and length of the horizon. The length of the effective FH is not fixed and depends on reservoir inflow. Moreover, larger errors will not always lead to greater flood risks. The proposed method provides useful information on flood risk for real-time reservoir operation.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Real-time reservoir flood control operation for cascade reservoirs using a two-stage flood risk analysis method
    Zhang, Xiaoqi
    Liu, Pan
    Xu, Chong-Yu
    Gong, Yu
    Cheng, Lei
    He, Shaokun
    JOURNAL OF HYDROLOGY, 2019, 577
  • [2] A two-stage method of quantitative flood risk analysis for reservoir real-time operation using ensemble-based hydrologic forecasts
    Pan Liu
    Kairong Lin
    Xiaojing Wei
    Stochastic Environmental Research and Risk Assessment, 2015, 29 : 803 - 813
  • [3] A two-stage method of quantitative flood risk analysis for reservoir real-time operation using ensemble-based hydrologic forecasts
    Liu, Pan
    Lin, Kairong
    Wei, Xiaojing
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2015, 29 (03) : 803 - 813
  • [4] Risk Analysis for Real-Time Flood Control Operation of a Reservoir
    Chen, Juan
    Zhong, Ping-an
    Xu, Bin
    Zhao, Yun-fa
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (08)
  • [5] Fuzzy model for real-time reservoir operation
    Dubrovin, T
    Jolma, A
    Turunen, E
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2002, 128 (01) : 66 - 73
  • [6] A real-time operation of the Three Gorges Reservoir with flood risk analysis
    Sun, Yixiang
    Tang, Deshan
    Dai, Huichao
    Liu, Pan
    Sun, Yifei
    Cui, Qingfeng
    Zhang, Fanping
    Ding, Yifan
    Wei, Yuhang
    Zhang, Jinxin
    Wang, Mei
    Li, Aodian
    Meng, Zhenzhu
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2016, 16 (02): : 551 - 562
  • [7] A scalable two-stage model for real-time Wetland bird recognition
    Xia, Wenyuan
    Zhou, Qing
    Wu, Dayu
    Wang, Siyuan
    Zhou, Mengshuang
    JOURNAL OF SUPERCOMPUTING, 2025, 81 (04):
  • [8] Two-stage Robust Reserve Coordinated Operation Based On Real-time Price Mechanism
    Deng, Huiqiong
    Wu, Hui
    Liang, Zhiwei
    Tong, Zhe
    Shen, Junfu
    JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2025, 28 (05): : 1147 - 1159
  • [9] Two-stage Correction Strategy-based Real-time Dispatch for Economic Operation of Microgrids
    Sun, Jingliao
    Hu, Changhong
    Liu, Lei
    Zhao, Bei
    Liu, Jinyuan
    Shi, Jianquan
    CHINESE JOURNAL OF ELECTRICAL ENGINEERING, 2022, 8 (02): : 42 - 51
  • [10] Real-time reservoir operation for irrigation
    Mujumdar, PP
    Ramesh, TSV
    WATER RESOURCES RESEARCH, 1997, 33 (05) : 1157 - 1164