Status evaluation of EPB shield machine during tunneling in composite stratum

被引:0
|
作者
Dong, Yu [1 ]
机构
[1] China Railway 16 Bureau Group Beijing Metro Engineering Construction Co., Ltd., Beijing,101100, China
关键词
Tunneling (excavation) - Shielding - Tunneling machines - Tunnels;
D O I
10.19713/j.cnki.43-1423/u.T20200877
中图分类号
学科分类号
摘要
In order to provide the effective method forevaluating the status of earth pressure balance (EPB) shield machine during tunnel excavation in composite stratum, this study investigated the advancing state of EPB shield machine of Sanzao tunneling engineering, Zhuhai. This study was conducted based on the measured data, evident theory and membership function. Eight influencing factors weredetermined from practical tunnel projects. The measured data were classified into four levels. A comprehensive advancing state evaluation model of EPB shied machine based on evident theory was proposed. Evident theory is an effective method to fuse the measured data thatmakes the evaluation result more reliable. The developed model is convenient for operation. The evaluated results indicated that the developed model iseffective in the status evaluation of EPB shield machine in composite stratum. The evaluated result provides a tool to assess the state of EPB machine. © 2021, Central South University Press. All rights reserved.
引用
收藏
页码:2114 / 2120
相关论文
共 50 条
  • [41] Soil conditioning for EPB shield tunneling on the South Bay Ocean Outfall
    Williamson, GE
    Traylor, MT
    Higuchi, M
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 897 - 925
  • [42] TUNNELING MACHINES IN SOFT GROUND - A COMPARISON OF SLURRY AND EPB SHIELD SYSTEMS
    BABENDERERDE, S
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1991, 6 (02) : 169 - 174
  • [43] Effect of EPB Shield Tunneling on Adjacent High Speed Railway Viaduct
    Yuan, Xiang
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1234 - 1239
  • [44] Type selection matching and construction practice of shield tunneling machine for confined water stratum of subway tunnel
    地铁隧道承压水地层盾构机选型配套及施工实践
    Liu, Xuquan (664927880@qq.com), 1600, Chinese Society of Civil Engineering (53):
  • [45] Strength Analysis of Planetary Trains' Carrier of EPB Shield Machine
    Chen, Lifeng
    Wu, Xiaoling
    Qin, Datong
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 3303 - 3307
  • [46] The Influence of Different Karst Cave Filling Material Strengths on Stratum Stability During Shield Tunneling
    Zhongdong Fang
    Ning Ding
    Weimin Yang
    Zhicheng Dai
    Jing Wang
    Jingyuan He
    Ruosong Ding
    Xingzhi Ba
    Zongqing Zhou
    Geotechnical and Geological Engineering, 2023, 41 : 1309 - 1323
  • [47] The Influence of Different Karst Cave Filling Material Strengths on Stratum Stability During Shield Tunneling
    Fang, Zhongdong
    Ding, Ning
    Yang, Weimin
    Dai, Zhicheng
    Wang, Jing
    He, Jingyuan
    Ding, Ruosong
    Ba, Xingzhi
    Zhou, Zongqing
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (02) : 1309 - 1323
  • [48] Calculation of critical grouting pressure during shield tunneling in clay stratum and analysis of the influencing factors
    Ye Fei
    Gou Chang-fei
    Mao Jia-hua
    Yang Peng-bo
    Chen Zhi
    Jia Tao
    ROCK AND SOIL MECHANICS, 2015, 36 (04) : 937 - 945
  • [49] Failure analysis on the fracture of disc cutter in EPB shield machine
    Fu, Jie
    Xia, Yimin
    Zhang, Ling
    Lin, Laikuang
    Zhang, Xiaoyun
    Zhao, Shifang
    ENGINEERING FAILURE ANALYSIS, 2020, 108
  • [50] MUCK PROBLEMS IN SUBWAY SHIELD TUNNELING IN SANDY COBBLE STRATUM
    Cui, Kai
    Lin, Weikang
    POLISH MARITIME RESEARCH, 2016, 23 : 175 - 179