Long-term optimal operation method of cascaded hydroelectric plants for Songjiang River Inter-Basin Water Diversion System

被引:0
|
作者
Cheng, Xiong [1 ]
Wu, Xin-Yu [1 ]
Cheng, Chun-Tian [1 ]
Guo, Xi-Hai [2 ]
机构
[1] Dalian University of Technology, Dalian 116023, China
[2] Northeast Electric Power Dispatching and Communication Center Reservoir Operation Department, Shenyang 110006, China
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:493 / 501
相关论文
共 50 条
  • [31] Exploring optimal joint operating rules for large-scale inter-basin water transfer projects with multiple water sources, diversion routes, and water demand areas
    Zhong, Huayu
    Liao, Tao
    Fang, Guohua
    Ren, Kang
    Zhang, Shiwei
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2023, 49
  • [32] Seasonal and Long-Term Water Quality of Alfeios River Basin in Greece
    Aristeidis A. Bloutsos
    Vasiliki I. Syngouna
    Ioannis D. Manariotis
    Panayotis C. Yannopoulos
    Water, Air, & Soil Pollution, 2024, 235
  • [33] Seasonal and Long-Term Water Quality of Alfeios River Basin in Greece
    Bloutsos, Aristeidis A.
    Syngouna, Vasiliki I.
    Manariotis, Ioannis D.
    Yannopoulos, Panayotis C.
    WATER AIR AND SOIL POLLUTION, 2024, 235 (03):
  • [34] Short- and long-term prediction of energy to be produced in hydroelectric energy plants of Sakarya Basin in Turkey
    Ceribasi, Gokmen
    Caliskan, Muhammed
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2023, 45 (01) : 2680 - 2695
  • [35] The Optimal Operation of Parallel Pumping Stations for Inter-Basin Water Transfer Based on the Multi-Objective Optimization of a Single Pumping Station
    Gong, Yi
    Zhu, Bowen
    PROCESSES, 2022, 10 (10)
  • [36] Long-term effect of municipal water use on the water budget of the Ipswich River basin
    Canfield, S
    Claessens, L
    Hopkinson, C
    Rastetter, E
    Vallino, J
    BIOLOGICAL BULLETIN, 1999, 197 (02): : 295 - 297
  • [37] Flexible strategy searching algorithm for long term optimal operation models for inter basin hydropower systems
    Zeng, Yun
    Wu, Xinyu
    Cheng, Chuntian
    Tang, Hongbing
    Li, Chonghao
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2013, 33 (28): : 9 - 16
  • [38] LONG-TERM OPTIMAL OPERATION OF A PARALLEL MULTIRESERVOIR POWER-SYSTEM
    CHRISTENSEN, GS
    SOLIMAN, SA
    JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1986, 50 (03) : 383 - 395
  • [39] Analysis of Long-term Water Balance in the Middle Reaches of the Yellow River Basin
    Sato, Yoshinobu
    Ma, Xieyao
    Matsuoka, Masayuki
    Xu, Jianqing
    Fukushima, Yoshihiro
    PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL I, 2007, : 358 - 365
  • [40] Analysis of long-term water balance in the source area of the Yellow River basin
    Sato, Yoshinobu
    Ma, Xieyao
    Xu, Jianqing
    Matsuoka, Masayuki
    Zheng, Hongxing
    Liu, Changming
    Fukushima, Yoshihiro
    HYDROLOGICAL PROCESSES, 2008, 22 (11) : 1618 - 1629