Long-term optimal operation method of cascaded hydroelectric plants for Songjiang River Inter-Basin Water Diversion System

被引:0
|
作者
Cheng, Xiong [1 ]
Wu, Xin-Yu [1 ]
Cheng, Chun-Tian [1 ]
Guo, Xi-Hai [2 ]
机构
[1] Dalian University of Technology, Dalian 116023, China
[2] Northeast Electric Power Dispatching and Communication Center Reservoir Operation Department, Shenyang 110006, China
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:493 / 501
相关论文
共 50 条
  • [21] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Chuanxiong Kang
    Cheng Chen
    Jinwen Wang
    Water Resources Management, 2018, 32 : 3391 - 3404
  • [22] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Kang, Chuanxiong
    Chen, Cheng
    Wang, Jinwen
    WATER RESOURCES MANAGEMENT, 2018, 32 (10) : 3391 - 3404
  • [23] Multi-objective optimal water supply scheduling model for an inter-basin water transfer system: the South-to-North Water Diversion Middle Route Project, China
    Ouyang, Shuo
    Qin, Hui
    Shao, Jun
    Lu, Jiantao
    Bing, Jianping
    Wang, Xuemin
    Zhang, Rui
    WATER SUPPLY, 2020, 20 (02) : 550 - 564
  • [24] Variability and driving effect of aquatic gross primary productivity across long-distance inter-basin water diversion project
    Lai, Cheng
    Nong, Xizhi
    Chen, Lihua
    Zhang, Chi
    Campos, Luiza C.
    Behzadian, Kourosh
    Li, Ronghui
    JOURNAL OF CLEANER PRODUCTION, 2024, 468
  • [25] Multi-Objective Optimal Operation of the Inter-Basin Water Transfer Project Considering the Unknown Shapes of Pareto Fronts
    Xu, Jianjian
    Bai, Dan
    WATER, 2019, 11 (12)
  • [26] Derivation of Tri-level Programming Model for Multi-Reservoir Optimal Operation in Inter-Basin Transfer-Diversion-Supply Project
    Fang Wan
    Wenlin Yuan
    Jin Zhou
    Water Resources Management, 2017, 31 : 479 - 494
  • [27] Derivation of Tri-level Programming Model for Multi-Reservoir Optimal Operation in Inter-Basin Transfer-Diversion-Supply Project
    Wan, Fang
    Yuan, Wenlin
    Zhou, Jin
    WATER RESOURCES MANAGEMENT, 2017, 31 (01) : 479 - 494
  • [28] OPTIMAL LONG-TERM OPERATION OF A MULTIRESERVOIR POWER-SYSTEM FOR CRITICAL WATER CONDITIONS
    CHRISTENSEN, GS
    SOLIMAN, SA
    JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1987, 53 (03) : 377 - 393
  • [29] Reassessing Resettlement-Associated Poverty Induced by Water Conservancy Projects in China: Case Study of the "Yangtze to Huai River Inter-Basin" Water Diversion Project
    Lu, Yu
    Shangguan, Ziheng
    SUSTAINABILITY, 2023, 15 (12)
  • [30] Study on coupling of optimal water transfer and supply process for inter-basin water-transfer multi-reservoir system
    Guo X.
    Lei X.
    Li Y.
    Li J.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (07): : 949 - 958