Optimization models for Beijing's generation expansion planning under uncertainties

被引:0
|
作者
Liang, Yu-Xi [1 ]
Huang, Guo-He [1 ,2 ]
Lin, Qian-Guo [2 ]
Zhang, Xiao-Xuan [1 ]
Niu, Yan-Tao [1 ]
机构
[1] Energy and Environmental Research Center, North China Electric Power University, Beijing 102206, China
[2] Environmental Systems Engineering Program, Faculty of Engineering, University of Regina, Regina, Sask S4S OA2, Canada
关键词
Electric power system planning - Economic and social effects - Economics - Expansion;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:53 / 59
相关论文
共 50 条
  • [41] Partially Adaptive Stochastic Optimization for Electric Power Generation Expansion Planning
    Zou, Jikai
    Ahmed, Shabbir
    Sun, Xu Andy
    INFORMS JOURNAL ON COMPUTING, 2018, 30 (02) : 388 - 401
  • [42] Dynamic robust generation-transmission expansion planning in the presence of wind farms under long- and short-term uncertainties
    Ahmadi, Saeid
    Mavalizadeh, Hani
    Ghadimi, Ali Asghar
    Miveh, Mohammad Reza
    Ahmadi, Abdollah
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (23) : 5418 - 5427
  • [43] Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market
    Hemmati, Reza
    Hooshmand, Rahmat-Allah
    Khodabakhshian, Amin
    ENERGY CONVERSION AND MANAGEMENT, 2013, 76 : 517 - 526
  • [44] Private investor-based distributed generation expansion planning considering uncertainties of renewable generations
    Barati, Fatemeh
    Jadid, Shahram
    Zangeneh, Ali
    ENERGY, 2019, 173 : 1078 - 1091
  • [45] Long-term uncertainties in generation expansion planning: Implications for electricity market modelling and policy
    Scott, Ian J.
    Carvalho, Pedro M. S.
    Botterud, Audun
    Silva, Carlos A.
    ENERGY, 2021, 227
  • [46] RELIABILITY MODELS - THE INFLUENCE OF MODEL-SPECIFICATION IN GENERATION EXPANSION PLANNING
    STREMEL, JP
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1982, 101 (10): : 3669 - 3678
  • [47] Modeling Externality Costs and Intermittent Technologies in Generation Expansion Planning Models
    Arif Saeed Malik
    Aamir Al-Kharusi
    Ahmed Al-Khathiri
    Yousuf Al-Mahrouqi
    Operations Research Forum, 5 (4)
  • [48] Fuzzy optimization for supply chain planning under supply, demand and process uncertainties
    Peidro, David
    Mula, Josefa
    Poler, Raul
    Verdegay, Jose-Luis
    FUZZY SETS AND SYSTEMS, 2009, 160 (18) : 2640 - 2657
  • [49] Robust optimization for relief logistics planning under uncertainties in demand and transportation time
    Liu, Yajie
    Lei, Hongtao
    Zhang, Dezhi
    Wu, Zhiyong
    APPLIED MATHEMATICAL MODELLING, 2018, 55 : 262 - 280
  • [50] Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization
    Cho, Seolhee
    Li, Can
    Grossmann, Ignacio E.
    COMPUTERS & CHEMICAL ENGINEERING, 2022, 165