Dynamic robust generation-transmission expansion planning in the presence of wind farms under long- and short-term uncertainties

被引:10
|
作者
Ahmadi, Saeid [1 ]
Mavalizadeh, Hani [2 ]
Ghadimi, Ali Asghar [1 ]
Miveh, Mohammad Reza [3 ]
Ahmadi, Abdollah [4 ]
机构
[1] Arak Univ, Fac Engn, Dept Elect Engn, Arak 3815688349, Iran
[2] Univ Vermont, Dept Elect & Biomed Engn, Burlington, VT USA
[3] Tafresh Univ, Dept Elect Engn, Tafresh 3951879611, Iran
[4] Univ New South Wales, Sch Elect Engn & Telecommun, Sydney, NSW, Australia
关键词
power markets; wind power plants; power transmission planning; power generation planning; decision theory; demand side management; wind farms; short-term uncertainties; information-gap decision theory; multiyear long-term uncertainties; long-term decisions; wind power production; power system robustness; robust GEP-TEP expansion planning; dynamic GEP-TEP expansion planning; dynamic robust generation-transmission expansion planning; production capacity; scenario-based approach; electricity demand; Garver 6-bus system; IEEE 24-bus test system; OF-THE-ART; POWER-SYSTEMS; MODEL; MICROGRIDS; MANAGEMENT; ALGORITHM; MARKET; AC;
D O I
10.1049/iet-gtd.2019.1838
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The main goal of generation expansion planning (GEP) and transmission expansion planning (TEP) is to expand the power system to satisfy the increasing demand of electricity while maintaining efficient operation of the system. The major objective of this study is to propose a dynamic, robust GEP-TEP expansion planning in the presence of wind farms considering both long- and short-term uncertainties. The suggested model allows implementing information-gap decision theory on multi-year long-term uncertainties, such as demand growth and future increase in production capacity to decrease the risk in long-term decisions. Additionally, a scenario-based approach is employed for short-term uncertainties in demand and wind power production in a 1-year time horizon. The main advantage of the proposed model is to enhance the power system robustness against the uncertainties corresponding to forecast errors. To verify the robustness of the suggested expansion planning model, it is applied to the Garver 6-bus and IEEE 24-bus test systems.
引用
收藏
页码:5418 / 5427
页数:10
相关论文
共 50 条