共 50 条
- [2] Optimization design on deformation monitoring network in dam area of Jiangya hydroproject Renmin Changjiang/Yangtze River, 2002, 33 (06):
- [3] Deformation monitoring design and result analysis on high excavated slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2001, 32 (11): : 1 - 3
- [7] Research on sediment problems in TGP's dam area Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 2001, 18 (05): : 23 - 27
- [8] Optimization inversion of concrete dam's time-dependent parameters based on deformation monitoring data Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (SUPPL. 1): : 2941 - 2945
- [9] Rock-fill dam's void deformation monitoring ADVANCES IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-6, 2012, 518-523 : 1607 - +
- [10] Optimization on instrument arrangement of safety monitoring system of TGP Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 2001, 18 (05): : 73 - 75