共 50 条
- [3] Research on Sediment Problem in Dam Area of Three Gorges Project Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 770 - 773
- [4] Optimization design of deformation monitoring for TGP's dam Renmin Changjiang/Yangtze River, 2002, 33 (06):
- [5] Problems about monitoring of landslides in TGP reservoir area Renmin Changjiang/Yangtze River, 2000, 31 (06): : 7 - 9
- [8] On utilization of weathered sand as filling materials for Jiangxia Road in TGP dam area Renmin Changjiang/Yangtze River, 2001, 32 (09): : 16 - 17
- [10] Dam concrete temperature control for TGP's stage II works Renmin Changjiang/Yangtze River, 2001, 32 (10): : 18 - 19