共 50 条
- [2] Stabilizing the spillway section foundation at Pueblo Dam H2GEO: GEOTECHNICAL ENGINEERING FOR WATER RESOURCES, 2005, (02): : 55 - 65
- [3] Spillway design floods and dam safety International Journal on Hydropower and Dams, 1999, 6 (04): : 120 - 121
- [6] Hydraulic design of Nakasujigawa dam stepped spillway HYDRAULICS OF STEPPED SPILLWAYS, 2000, : 27 - 34
- [7] DESIGN OF SPILLWAY GATES OF IWAYA DAM. Doboku Gakkai-shi/Journal of the Japan Society of Civil Engineers, 1977, 62 (02): : 17 - 24
- [8] Optimization design of deformation monitoring for TGP's dam Renmin Changjiang/Yangtze River, 2002, 33 (06):
- [9] Structural design of steel-lined reinforcement concrete penstocks on downstream dam slope at TGP Renmin Changjiang/Yangtze River, 1997, 28 (10): : 21 - 23
- [10] Spatial elastoplastic analysis of reinforcing outlets in flood release dam section of TGP Renmin Changjiang/Yangtze River, 2001, 32 (04): : 9 - 11