Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance

被引:0
|
作者
School of Automation, Wuhan University of Technology, 122 Luoshi Road, Wuhan, Hubei, China [1 ]
机构
[1] Lei, Deming
来源
Lei, D. (deminglei11@163.com) | 1835年 / Springer London卷 / 66期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Journal article (JA)
引用
收藏
页码:9 / 12
相关论文
共 50 条
  • [41] Multi-Objective Flexible Job Shop Scheduling Using Genetic Algorithms
    Boudjemline, Attia
    Chaudhry, Imran Ali
    Rafique, Amer Farhan
    Elbadawi, Isam A-Q
    Aichouni, Mohamed
    Boujelbene, Mohamed
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (05): : 1706 - 1713
  • [42] Multi-objective flexible Job Shop scheduling with lot-splitting
    Bai, Jun-Jie
    Gong, Yi-Guang
    Wang, Ning-Sheng
    Tang, Dun-Bing
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (02): : 396 - 403
  • [43] Apply MGA to multi-objective Flexible Job Shop Scheduling Problem
    Yang, Xiaomei
    Zeng, Jianchao
    Liang, Jiye
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 3, PROCEEDINGS, 2009, : 436 - +
  • [44] A Memetic Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem
    Yuan, Yuan
    Xu, Hua
    GECCO'13: PROCEEDINGS OF THE 2013 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2013, : 559 - 566
  • [45] Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
    Zhang, Sicheng
    Li, Xiang
    Zhang, Bowen
    Wang, Shouyang
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 283 (02) : 441 - 460
  • [46] A multi-strategy integration Pareto artificial bee colony algorithm for flexible job shop scheduling problems
    Zhao B.
    Gao J.
    Fu Y.
    Zhao J.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (05): : 1225 - 1235
  • [47] Artificial bee colony algorithm for fuzzy job shop scheduling
    Zheng, You-Lian
    Li, Yuan-Xiang
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 44 (02) : 124 - 129
  • [48] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling
    Jing, Zha
    Hua, Jin
    Yi, Zhu
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
  • [49] Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
    Seyed Habib A. Rahmati
    M. Zandieh
    M. Yazdani
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 915 - 932
  • [50] Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
    Rahmati, Seyed Habib A.
    Zandieh, M.
    Yazdani, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 915 - 932