Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system

被引:78
|
作者
Zhang, Sicheng [1 ]
Li, Xiang [1 ]
Zhang, Bowen [1 ]
Wang, Shouyang [2 ]
机构
[1] Beijing Univ Chem Technol, Coll Econ & Management, 15 North 3rd Ring Rd East, Beijing 100029, Peoples R China
[2] Chinese Acad Sci, Acad Math & Syst Sci, 55 Zhongguancun East Rd, Beijing 100190, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Flexible assembly job shop scheduling; Multi-objective optimisation; Meta-heuristics; Ant colony optimisation; PARTICLE SWARM OPTIMIZATION; INTEGER PROGRAMMING-MODEL; EVOLUTIONARY ALGORITHM; ORDER REVIEW/RELEASE; DISPATCHING RULES; GENETIC ALGORITHM; MINIMIZE MAKESPAN; SEARCH ALGORITHM; FLOWSHOP; SETUP;
D O I
10.1016/j.ejor.2019.11.016
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the production scheduling problem in a flexible manufacturing system with two adjacent working areas, whose products are incorporated with flexible non-linear process plans and assembling operations. The basic parts are produced in one area before they are transported to the other area for assembly. The assembling structures of products are either flat or multi-levelled. Sequence-dependent setup times of operations and transition times of jobs between machines are considered separately from processing times. Lot streaming is considered beforehand such that each job represents a basic part instead of a batch of identical parts. Identical subassemblies are shared by all possible assembling operations, instead of being pre-associated with any product. Makespan, total tardiness and total workload are taken as objectives to be optimised. We propose a distributed ant colony system to solve the problem and explore the Pareto front. The approach is first compared with other methods, using several sets of hypothetical test cases with different sizes and complexities; then, it is applied to solve a ball valve production scheduling problem under different scenarios. We show that the proposed approach outperforms most of the other methods for the tested problems, especially for large-scale instances, making it a valuable and competitive approach for solving practical production scheduling problems. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:441 / 460
页数:20
相关论文
共 50 条
  • [1] Hybrid Ant Colony Multi-Objective Optimization for Flexible Job Shop Scheduling Problems
    Luo, De-Lin
    Chen, Hai-Ping
    Wu, Shun-Xiang
    Shi, Yue-Xiang
    JOURNAL OF INTERNET TECHNOLOGY, 2010, 11 (03): : 361 - 369
  • [2] An Improved Ant Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, Li
    Wang, Keqi
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 697 - +
  • [3] Ant colony optimisation for multi-level assembly job shop scheduling
    Omkumar, M.
    Shahabudeen, P.
    International Journal of Manufacturing Research, 2009, 4 (04) : 410 - 427
  • [4] Ant colony optimisation for scheduling of flexible job shop with multi-resources requirements
    Kalinowski, Krzysztof
    Krenczyk, Damian
    Paprocka, Iwona
    Kempa, Wojciech M.
    Grabowik, Cezary
    21ST INNOVATIVE MANUFACTURING ENGINEERING & ENERGY INTERNATIONAL CONFERENCE - IMANE&E 2017, 2017, 112
  • [5] Multi-objective flexible job shop schedule based on ant colony algorithm
    Jiang Xuesong
    Tao Qiaoyun
    14TH INTERNATIONAL SYMPOSIUM ON DISTRIBUTED COMPUTING AND APPLICATIONS FOR BUSINESS, ENGINEERING AND SCIENCE (DCABES 2015), 2015, : 70 - 73
  • [6] Two-stage hybrid pareto ant colony algorithm for multi-objective flexible job shop scheduling
    Zhao B.
    Gao J.
    Chen K.
    Gao, Jianmin, 1600, Xi'an Jiaotong University (50): : 145 - 151
  • [7] Multi-objective Flexible Job Shop Schedule Based on Improved Ant Colony Algorithm
    Li, Li
    Wang, Keqi
    ICIA: 2009 INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, VOLS 1-3, 2009, : 1158 - +
  • [8] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [9] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [10] Multi-objective optimisation for energy-aware flexible job-shop scheduling problem with assembly operations
    Ren, Weibo
    Wen, Jingqian
    Yan, Yan
    Hu, Yaoguang
    Guan, Yu
    Li, Jinliang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (23) : 7216 - 7231