Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system

被引:78
|
作者
Zhang, Sicheng [1 ]
Li, Xiang [1 ]
Zhang, Bowen [1 ]
Wang, Shouyang [2 ]
机构
[1] Beijing Univ Chem Technol, Coll Econ & Management, 15 North 3rd Ring Rd East, Beijing 100029, Peoples R China
[2] Chinese Acad Sci, Acad Math & Syst Sci, 55 Zhongguancun East Rd, Beijing 100190, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Flexible assembly job shop scheduling; Multi-objective optimisation; Meta-heuristics; Ant colony optimisation; PARTICLE SWARM OPTIMIZATION; INTEGER PROGRAMMING-MODEL; EVOLUTIONARY ALGORITHM; ORDER REVIEW/RELEASE; DISPATCHING RULES; GENETIC ALGORITHM; MINIMIZE MAKESPAN; SEARCH ALGORITHM; FLOWSHOP; SETUP;
D O I
10.1016/j.ejor.2019.11.016
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the production scheduling problem in a flexible manufacturing system with two adjacent working areas, whose products are incorporated with flexible non-linear process plans and assembling operations. The basic parts are produced in one area before they are transported to the other area for assembly. The assembling structures of products are either flat or multi-levelled. Sequence-dependent setup times of operations and transition times of jobs between machines are considered separately from processing times. Lot streaming is considered beforehand such that each job represents a basic part instead of a batch of identical parts. Identical subassemblies are shared by all possible assembling operations, instead of being pre-associated with any product. Makespan, total tardiness and total workload are taken as objectives to be optimised. We propose a distributed ant colony system to solve the problem and explore the Pareto front. The approach is first compared with other methods, using several sets of hypothetical test cases with different sizes and complexities; then, it is applied to solve a ball valve production scheduling problem under different scenarios. We show that the proposed approach outperforms most of the other methods for the tested problems, especially for large-scale instances, making it a valuable and competitive approach for solving practical production scheduling problems. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:441 / 460
页数:20
相关论文
共 50 条
  • [21] Multi-objective fuzzy flexible job shop scheduling using memetic algorithm
    Wang, Chun
    Tian, Na
    Ji, Zhicheng
    Wang, Yan
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2017, 87 (14) : 2828 - 2846
  • [22] Multi-Objective Artificial Bee Colony for Assembly Flexible Job Shop with Transportation and Setup Times
    Han, Runxin
    Li, Junqing
    Xiao, Xiumei
    PROCEEDINGS OF THE 2023 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION, GECCO 2023 COMPANION, 2023, : 363 - 366
  • [23] Hybrid Multi-Objective Artificial Bee Colony for Flexible Assembly Job Shop with Learning Effect
    Du, Zhaosheng
    Li, Junqing
    Li, Jiake
    MATHEMATICS, 2025, 13 (03)
  • [24] An artificial bee colony approach for multi-objective job shop scheduling
    Scaria, Abyson
    George, Kiran
    Sebastian, Jobin
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 1030 - 1037
  • [25] Multi-objective Job Shop Scheduling using a Modified Artificial Bee Colony Algorithm
    Zhang, Hao
    Zhu, Yunlong
    Ku, Tao
    2017 IEEE 7TH ANNUAL INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2017, : 701 - 706
  • [26] Disruption management of multi-objective flexible job shop scheduling problem
    Sun, Jinghua
    Xu, Li
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 50 - 56
  • [27] A benchmark dataset for multi-objective flexible job shop cell scheduling
    Deliktas, Derya
    Ozcan, Ender
    Ustun, Ozden
    Torkul, Orhan
    DATA IN BRIEF, 2024, 52
  • [28] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS
    Zhang, Guo-Hui
    Dang, Shi-Jie
    Deng, Xiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952
  • [29] Multi-objective flexible job shop scheduling problem with key objectives
    Guo, Chengzhi
    Li, Ming
    Lei, Deming
    2019 34RD YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2019, : 23 - 27
  • [30] A simulated multi-objective model for flexible job shop transportation scheduling
    Yiyi Xu
    M’hammed Sahnoun
    Fouad Ben Abdelaziz
    David Baudry
    Annals of Operations Research, 2022, 311 : 899 - 920