Simulation of bridge steel structure construction process based on BIM technology

被引:0
|
作者
Pan W. [1 ]
机构
[1] SHEC STRCTURAL ENGINEERING LTD., Hubei, Wuhan
关键词
BIM technology; Construction simulation; Edge folding algorithm; Folding cost function; Quadratic error metric;
D O I
10.2478/amns-2024-1176
中图分类号
学科分类号
摘要
With the rapid development of computer technology and information technology, bridge engineering is gradually transformed into information technology, and bridge BIM design technology is increasingly concern by the industry. This paper uses BIM technology to simulate the construction process of bridge steel structures. In order to solve the problem that the first model of BIM is too complicated, this paper utilizes the edge folding algorithm and quadratic error metric to refold the model and establish the new vertex coordinates, and at the same time, introduces the folding cost function to maintain the model characteristics. In the simulation experiments of the bridge structure construction, stress changes of the main girder of the bridge body are analyzed in various merging states. When the fitting error is +15mm, +25mm, and +35mm, the stress on the upper edge of the main girder near the top of the pier increases by 0.24MPa, 0.52MPa, and 0.78MPa, respectively, for the selection of materials and the prediction of construction and assembly parameters, in which the length of the steel girder N1 is accurate to the millimeters, which is 39940mm, and the single piece weighs 9,532.5kg. To prevent collision and interference with the bridge pier, the crane should be raised at a height of not less than 6.6m during the lifting stage. It can be seen that BIM technology can not only simulate and predict non-geometric factors such as the materials used but also simulate the margin of error and the bridge stresses as a way to help bridge projects on the ground. © 2024 Wenming Pan, published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [1] Optimize bridge construction process based on BIM technology
    Shi, X. F.
    Liu, Z. Q.
    Yan, X.
    Ma, Z. Q.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 250 - 250
  • [2] Visual Simulation Research on Construction of Super High-Rise Steel Structure Project Based on BIM Technology
    Feng, Hui
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2019, 124 : 271 - 271
  • [3] Truss construction of green fabricated steel structure based on BIM intelligent technology
    Xu J.
    International Journal of Critical Infrastructures, 2021, 17 (01): : 54 - 70
  • [4] Truss construction of green fabricated steel structure based on BIM intelligent technology
    Xu, Jianhong
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2021, 17 (01) : 54 - 70
  • [5] Construction Process Simulation of Building Decoration based on BIM and Computer-Aided Technology
    Dong Y.
    Zhang Y.
    Sang F.
    Computer-Aided Design and Applications, 2023, 20 (S15): : 294 - 308
  • [6] BIM Technology in bridge engineering construction simulation and control application<bold> </bold>
    Li, Y.
    Wen, Y.
    Lian, P.
    LIFE-CYCLE CIVIL ENGINEERING: INNOVATION, THEORY AND PRACTICE, IALCCE 2020, 2021, : 695 - 699
  • [7] Research on Construction of Highway Bridge Quality Engineering Based on BIM Technology
    Zhang, Kechao
    Wang, Chen
    Liu, Xiangsheng
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [8] Analysis of Railway Bridge Girder Installation and Construction Technology-Based on BIM Technology
    Ke L.
    Wan R.
    Appl. Math. Nonlinear Sci., 1
  • [9] Simulation application of building construction management based on BIM technology
    Deng, Jianxun
    PROCEEDINGS OF 2020 IEEE 2ND INTERNATIONAL CONFERENCE ON CIVIL AVIATION SAFETY AND INFORMATION TECHNOLOGY (ICCASIT), 2020, : 590 - 593
  • [10] Simulation Study on Construction Process of Complex Spatial Steel Structure Based on the-Construction Mechanics
    Zhang, Weilin
    Wu, Zhixin
    Chen, Baihui
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1209 - +