Steel plant - Supplier relationship

被引:0
|
作者
机构
[1] Sleeper, S.D.
[2] Colón, M.
[3] Fruehan, R.J.
来源
Sleeper, S.D. | 2000年 / Iron and Steel Society卷 / 27期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Supplier relationship impacts on postponement strategies
    Saghiri, Soroosh
    Hill, Alex
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (07) : 2134 - 2153
  • [22] A framework for supplier relationship management (SRM)
    Moeller, Sabine
    Fassnacht, Martin
    Klose, Sonja
    JOURNAL OF BUSINESS-TO-BUSINESS MARKETING, 2006, 13 (04) : 69 - 94
  • [23] The future of the global supplier/manufacturer relationship
    Degen, HJ
    PROCEEEDINGS OF THE 4TH WORLD CONFERENCE ON DETERGENTS: STRATEGIES FOR THE 21ST CENTURY, 1999, : 11 - 16
  • [24] Telecommunications operators and supplier - The new relationship
    Freeze, J
    BRITISH TELECOMMUNICATIONS ENGINEERING, 1998, 17 : 11 - 15
  • [25] Relationship stability and supplier commitment to quality
    Lai, KH
    Cheng, TCE
    Yeung, ACL
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (03) : 397 - 410
  • [26] THE EVOLUTION OF THE FINISHER-SUPPLIER RELATIONSHIP
    SAAS, WJ
    PLATING AND SURFACE FINISHING, 1985, 72 (05): : 34 - 34
  • [27] The Supplier Relationship Management Market Trends
    Campelo, Eulalio G.
    Stucky, Wolffried
    PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 22, 2007, 22 : 105 - 110
  • [28] Supplier Relationship Management im Krankenhaus
    Tobias Mettler
    Peter Rohner
    HMD Praxis der Wirtschaftsinformatik, 2008, 45 (1) : 87 - 95
  • [29] Starting off on a new supplier relationship
    Wetzel, Shannon
    Metal Casting Design and Purchasing, 2019, 21 (03):
  • [30] Managing supplier relationship step by step
    Li, JF
    Cui, NF
    PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 1011 - 1015