Supplier relationship impacts on postponement strategies

被引:16
|
作者
Saghiri, Soroosh [1 ]
Hill, Alex [2 ]
机构
[1] Cranfield Univ, Sch Management, Cranfield MK43 0AL, Beds, England
[2] Univ Kingston, Kingston Business Sch, Kingston Upon Thames KT1 2EE, Surrey, England
关键词
postponed product design; supplier relationship; postponed production; postponed purchasing; FORM POSTPONEMENT; PRODUCT DEVELOPMENT; MASS CUSTOMIZATION; MANUFACTURING POSTPONEMENT; CHAIN MANAGEMENT; PERFORMANCE; TRUST; INTEGRATION; DESIGN; UNCERTAINTY;
D O I
10.1080/00207543.2013.857053
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The main purpose of this paper is to examine the impact of the supplier relationship on postponement implementation in the buying firm. The links between three supplier relationship constructs and three postponement constructs are hypothesised and tested through structural modelling. These hypotheses are then tested using empirical data of a sample of 219 manufacturing firms. The findings suggest that the ability of the buying firm to delay product design decisions (postponement in product design) is positively related to the level of supplier commitment, supplier expectation of a continuing relationship with the buyer, and level of joint buyer and supplier actions. However, the buying firm's ability to delay purchasing decisions about which items to order or how many to order (postponement in purchasing operations) was only positively related to the level of joint buyer and supplier actions. By contrast, the buying firm's ability to delay the final product configuration (postponement in production operations) was not directly affected by those aspects of the supplier relationship investigated. These findings give greater insight into how different aspects of supplier relationship impact different types of postponement than previous research and have significant implications for practice.
引用
收藏
页码:2134 / 2153
页数:20
相关论文
共 50 条