Cable-stayed bridge uses new post-tensioning system

被引:0
|
作者
Caroland, William B.
Suarez, Jorge M.
机构
来源
| 2000年 / AISC, Chicago, IL, USA卷 / 40期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    Better Roads, 2004, 74 (02): : 94 - 97
  • [42] OPERATION AND MAINTENANCE OF CABLE-STAYED BRIDGE
    Tian Chunyan
    Yang Shengchao
    Zhang Na
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1059 - +
  • [43] Post-tensioning cuts steel bridge costs
    Spaans, Leo
    Modern Steel Construction, 1994, 34 (09): : 38 - 43
  • [44] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI
    不详
    WELDING DESIGN & FABRICATION, 1984, 57 (06): : 67 - 70
  • [45] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [46] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [47] Basarab Cable-Stayed Bridge in Bucharest
    Manterola Armisen, Javier
    Martinez Cutillas, Antonio
    Fuente Garcia, Silvia
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 392 - 395
  • [48] BRIDGE REHABILITATION AND STRENGTHENING BY CONTINUOUS POST-TENSIONING
    VERNIGOR.E
    MARCIL, JRM
    SLATER, WM
    AIKEN, RV
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1969, 14 (02): : 88 - &
  • [49] FOUNDATIONS OF THE ANNACIS CABLE-STAYED BRIDGE
    BAZETT, DJ
    MCCAMMON, NR
    CANADIAN GEOTECHNICAL JOURNAL, 1986, 23 (04) : 458 - 471
  • [50] Modal identification of a cable-stayed bridge
    Yen, WHP
    Baber, TT
    Barton, FW
    ENGINEERING MECHANICS: PROCEEDINGS OF THE 11TH CONFERENCE, VOLS 1 AND 2, 1996, : 600 - 603