Cable-stayed bridge uses new post-tensioning system

被引:0
|
作者
Caroland, William B.
Suarez, Jorge M.
机构
来源
| 2000年 / AISC, Chicago, IL, USA卷 / 40期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [11] CABLE TENSIONING IN CABLE-STAYED BRIDGES BY COMBINATION METHOD
    Wang, Wei
    Qu, Wei-Lian
    PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 1569 - 1573
  • [12] Bridge management system development for a cable-stayed bridge
    Sungkon Kim
    KSCE Journal of Civil Engineering, 2001, 5 (1) : 43 - 49
  • [13] Comparison of different techniques for measuring the cable tension of a cable-stayed bridge during the tensioning process
    Vicente, M. A.
    Gonzalez, D. C.
    Fu, G.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 554 - 554
  • [14] Uddevalla cable-stayed bridge
    Hansvold, C
    Lundh, L
    Larsson, KE
    Nilsson, H
    STRAIT CROSSINGS 2001, 2001, : 27 - 33
  • [15] The Millau cable-stayed bridge
    Virlogeux, M
    RECENT DEVELOPMENTS IN BRIDGE ENGINEERING, 2003, : 3 - 18
  • [16] Innovative cable-stayed bridge
    Christoffersen, Jens
    Jensen, Henrik Elgaard
    Hauge, Lars
    Bjerrum, John
    Concrete (London), 1998, 32 (07): : 32 - 34
  • [17] The colletta cable-stayed bridge
    Petrangeli, Mario Paolo
    Industria Italiana del Cemento, 2006, 76 (823): : 728 - 743
  • [18] Cable-stayed pedestrian bridge
    Fernandez, P
    PCI JOURNAL, 2000, 45 (04): : 119 - 119
  • [19] Optimization of tensioning strategy for asymmetric cable-stayed bridge and its effect on construction process
    Lee, Tae-Yeol
    Kim, Young-Hoon
    Kang, Sung-Won
    STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2008, 35 (06) : 623 - 629
  • [20] Optimization of tensioning strategy for asymmetric cable-stayed bridge and its effect on construction process
    Tae-Yeol Lee
    Young-Hoon Kim
    Sung-Won Kang
    Structural and Multidisciplinary Optimization, 2008, 35 : 623 - 629