The discrete time, cost and quality trade-off problem in project scheduling: An efficient solution method based on cellde algorithm

被引:0
|
作者
Assadipour, Gh. [1 ]
Iranmanesh, H. [1 ]
机构
[1] Department of Industrial Engineering, University of Tehran, Iran
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:93 / 101
相关论文
共 50 条
  • [41] Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program
    Chen, Liangwei
    Zhang, Jingwen
    Peng, Wuliang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
  • [42] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306
  • [43] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [44] Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms
    Ghadir, Hojjatullah
    Shayannia, Seyed Ahmad
    Miandargh, Mehdi Amir
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2022, 2022
  • [45] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [46] Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
    Liu, Dian
    Li, Heng
    Wang, Hongwei
    Qi, Chao
    Rose, Timothy
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 148
  • [47] A Developmental Genetic Approach to the cost/time trade-off in Resource Constrained Project Scheduling
    Pawinski, Grzegorz
    Sapiecha, Krzysztof
    FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 171 - 179
  • [48] Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 51 : 177 - 185
  • [49] An Integer Grey Goal Programming For Project Time, Cost and Quality Trade-Off
    Hajiagha, Seyed Hossein Razavi
    Akrami, Hadi
    Hashemi, Shide Sadat
    Mahdiraji, Hannan Amoozad
    INZINERINE EKONOMIKA-ENGINEERING ECONOMICS, 2015, 26 (01): : 93 - 100
  • [50] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +