Mathematical model and algorithm for automatically programming the stage plan of marshalling station

被引:0
|
作者
Wang, Shidong [1 ]
Zheng, Li [1 ]
Zhang, Zhihai [1 ]
Liu, Shucheng [2 ]
机构
[1] Department of Industrial Engineering, Tsinghua University, Beijing 100084, China
[2] Transport Department, Urumchi Railway Bureau, Urumchi 830011, China
来源
关键词
Algorithms - Mathematical models - Planning - Railroad stations - Railroad transportation;
D O I
暂无
中图分类号
学科分类号
摘要
Based on the practical operation flow of marshalling station, the automatic programming for the stage plan can be separated into the automatic programming of flow assignment plan, break-up/formation plan and the utilization plan for arrival/departure line. Mathematical models are built respectively for them and solutions are worked out. Under the precondition of satisfying the requirements for train formations and with the minimum total dwell time of the transfer train unit at the marshalling station as the target, the flow assignment plan model fixes on train flow source for outbound trains from trains on hand and in-bounds at the moment. After the flow assignments for train units and with the minimum total number of delayed trains as the target, break-up/formation plan model determines the break-up/formation sequence of trains. Under the condition of current track configuration and with the maximum number of reception/departure trains as the target, the model of utilization plan for arrival/departure line reasonably arranges the reception/departure of trains scheduled by train diagram. The automatic programming for the stage plan of marshalling station can be realized by rationally linking up the abovementioned three models together. A computer aided decision support system is built by adopting the proposed three models and is being applied at Urumchi West Station.
引用
收藏
页码:120 / 125
相关论文
共 50 条
  • [1] Study on Optimal Model and Algorithm of Sorting Sequence of Stage Plan on Marshalling Station
    Li, Lei
    Cui, BingMou
    2008 WORKSHOP ON POWER ELECTRONICS AND INTELLIGENT TRANSPORTATION SYSTEM, PROCEEDINGS, 2008, : 574 - +
  • [2] Robust Stage Plan for a Railway Marshalling Station
    Ma, Liang
    Guo, Jin
    2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2014, : 195 - 200
  • [3] Optimal model and algorithm of stage plan of intelligent dispathing system for marshalling stations
    Wang, Ming-Hui
    Zhao, Qiang
    Tiedao Xuebao/Journal of the China Railway Society, 2005, 27 (06): : 1 - 9
  • [4] Optimal model and algorithm on stage plan for section station
    Yuan, Qingda
    Du, Wen
    Li, Qingsong
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2000, 35 (03): : 250 - 254
  • [5] Coupling and Adjustment of Stage Plan and Dynamic Railcar Flow in Marshalling Station
    Xue F.
    Zhao L.
    Fan Q.
    Tiedao Xuebao/Journal of the China Railway Society, 2020, 42 (02): : 18 - 26
  • [6] Study on plan of track lines in marshalling station
    Wang, Shidong
    Zheng, Li
    Zhang, Zhihai
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 852 - 856
  • [7] Integer programming model and algorithm for wagon-flow allocation problem at double-direction marshalling station
    Zhao, Jun
    Peng, Qi-Yuan
    Tiedao Xuebao/Journal of the China Railway Society, 2014, 36 (09): : 10 - 19
  • [8] Optimization algorithm for route dispatching in marshalling station
    Signal and Communication Research Institute, China Academy of Railway Sciences, Beijing 100081, China
    不详
    不详
    Zhongguo Tiedao Kexue, 2007, 2 (100-104):
  • [9] Collaborative optimization model and algorithm for wagon-ow allocation in railway marshalling station
    Xue, Feng
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (11): : 2930 - 2936
  • [10] Model and algorithm of wagon-flow allocating in marshalling station based on sequence theory
    Jing, Yun
    Guo, Siye
    Zhang, Zhenhua
    Jeng, Embrima
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 37 (01) : 527 - 536