Coupling and Adjustment of Stage Plan and Dynamic Railcar Flow in Marshalling Station

被引:0
|
作者
Xue F. [1 ,2 ,3 ]
Zhao L. [4 ]
Fan Q. [1 ]
机构
[1] School of Transportation and Logistics, Southwest Jiaotong University, Chengdu
[2] National Engineering Laboratory of Integrated Transporation Big Data Application Technology, Chengdu
[3] National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu
[4] Municipal Design Institute, China Southwest Architectural Design and Research Institute Co., Ltd., Chengdu
来源
关键词
Coupling degree; Dynamic railcar flow; Marshalling station; Railway transportation; Stage plan;
D O I
10.3969/j.issn.1001-8360.2020.02.003
中图分类号
学科分类号
摘要
The stage plan of marshalling station will be affected by the fluctuation of railcar flow in the process of implementation. A way to measure the coupling relationship between the stage plan and the dynamic railcar flow and to control the railcar flow in a certain range is very important for the dispatching operation of marshalling stations. The allowable variation ranges of train delay time, the break-up operation time and marshalling operation time were analyzed under the condition that the implementation resources of the station stage plan had been determined. Then the method of calculating the coupling degree between the station stage plan and the dynamic railcar flow was given. An optimization model was established to reduce the impact on the overall operation of a station when the change of railcar flow was beyond the allowable range, and railcar sources were adjusted without changing the original disassembling and marshalling sequence. The example shows that the station stage plan is susceptible to the factors such as the arrival time of train, the difference between the actual arrival of train and the expected arrival of train, and the fluctuation range of break-up operation time and marshalling operation time. The coupling degree between the stage plan and the dynamic railcar flow can be improved to a certain extent by reasonable railcar flow assignment. © 2020, Department of Journal of the China Railway Society. All right reserved.
引用
收藏
页码:18 / 26
页数:8
相关论文
共 11 条
  • [1] Niu H., Hu A., Comprehensive Optimization of Car Flows Joining at Bidirectional Marshalling Station, Journal of the China Railway Society, 20, 6, pp. 16-21, (1998)
  • [2] He S., Song R., Hu A., Study on Coordination of Hard and Soft Optimization of Marshalling Station Stage Plan, Journal of the China Railway Society, 21, 4, pp. 1-8, (1999)
  • [3] Wang C., Study on Wagon-flow Allocating Problem in a Marshaling Station by Using Calculating Method On-table, Journal of the China Railway Society, 24, 4, pp. 1-5, (2002)
  • [4] Jing Y., Wang C., The Model and Algorithm of Wagon-flow Allocation in Dispatching System of Marshalling Station under Uncertainty, Journal of the China Railway Society, 32, 4, pp. 8-12, (2010)
  • [5] Jacob R., Marton P., Maue J., Et al., Multistage Methods for Freight Train Classification, Networks, 57, 1, pp. 87-105, (2011)
  • [6] Adlbrecht J., Huttler B., Zazgornik J., Et al., The Train Marshalling by a Single Shunting Engine Problem, Transportation Research Part C: Emerging Technologies, 58, 7, pp. 56-72, (2015)
  • [7] Boysen N., Emde S., Fliedner M., The Basic Train Makeup Problem in Shunting Yards, OR Spectrum, 38, 1, pp. 207-233, (2016)
  • [8] Bohlin M., Gestrelius S., Dahms F., Et al., Optimization Methods for Multistage Freight Train Formation, Transportation Science, 50, 3, pp. 823-840, (2016)
  • [9] Fu X., Jing X., Shi Q., Calculation and Analysis of Coupling Degree of the Transportation Corridor & Economic Belt System on the Basis of ANN, Journal of the China Railway Society, 32, 1, pp. 85-92, (2010)
  • [10] Sun Q., Gao J., Zou H., Et al., The Coupling Mechanism and Its Coordination Degree Model of Transport Corridor, Journal of Chang'an University (Natural Science Edition), 34, 5, pp. 84-89, (2014)