共 50 条
- [23] Comprehensive Optimization Model of Stage Development about Marshalling Stations ADVANCED TRANSPORTATION, PTS 1 AND 2, 2011, 97-98 : 485 - +
- [24] The GI/G/I queuing model in the operation procedure of the railway marshalling station TRAFFIC AND TRANSPORTATION STUDIES, 1998, : 477 - 487
- [26] Evaluating the SBR Algorithm using Automatically Generated Plan Libraries PROCEEDINGS OF 2016 5TH BRAZILIAN CONFERENCE ON INTELLIGENT SYSTEMS (BRACIS 2016), 2016, : 205 - 210
- [28] Bi-level programming model and algorithm of passenger train operation plan Zhongguo Tiedao Kexue/China Railway Science, 2007, 28 (03): : 110 - 116
- [30] Mathematical Model and Genetic Algorithm in Computer Programming Optimization and Network Topology Structure WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2022, 2022