Rolling Stock Scheduling Algorithm for Temporary Timetable After Natural Disaster

被引:0
|
作者
Kato, Satoshi [1 ]
Nakahigashi, Taichi [1 ]
Kokubo, Tatsuya [1 ]
Imaizumi, Jun [2 ]
机构
[1] Transport Operation Systems Laboratory, Signalling and Operation Systems Technology Division
[2] Toyo University, Japan
关键词
Disasters - Mathematical programming;
D O I
10.2219/rtriqr.65.3_182
中图分类号
学科分类号
摘要
This paper focuses on rolling stock scheduling after a large-scale natural disaster. In general, a temporary timetable is generated when sections of a line are partially disrupted by damage caused by the natural disaster. The next step is to generate a rolling stock schedule that is as close as possible to the original schedule at the time of timetable revision. We propose a two-phase rolling stock scheduling algorithm based on a mathematical programming method to cope with the temporary timetable. In addition, we confirm that the proposed algorithm can produce a practical rolling stock schedule in terms of evaluation criteria and computational time. © 2024 Ken-yusha Inc.. All rights reserved.
引用
收藏
页码:182 / 187
相关论文
共 50 条
  • [31] Rolling Stock Rescheduling in High-speed Railway with Given Rescheduled Timetable under Segment Blockage
    Li D.
    Peng Q.
    Zhao J.
    Wang D.
    Zhong Q.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (10): : 21 - 33
  • [32] Bi-objective optimization of timetable and rolling stock schedule for an urban rail passenger and freight line
    Yao, Yu
    Li, Pei
    Mo, Pengli
    D'Ariano, Andrea
    Appolloni, Andrea
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [33] Urban Rail Transit Rolling Stock Scheduling Optimization with Shared Depot
    Feng, Jia
    Li, Guowei
    Shi, Yuxin
    Li, Zhengzhong
    Liu, Shanshan
    SUSTAINABILITY, 2022, 14 (22)
  • [34] Short-term rolling stock rostering and maintenance scheduling optimization
    Ottimizzazione della circolazione del materiale rotabile e dei processi manutentivi nel breve periodo
    1600, CIFI Collegio Ingegneri Ferroviari Italiani (69):
  • [35] Development of Reactive Scheduling for Rolling Stock Operation using a Constraint Model
    Tomiyama, Tomoe
    Sato, Tatsuhiro
    Murata, Tomohiro
    Iwamura, Shigeki
    Sakamoto, Osamu
    ELECTRICAL ENGINEERING IN JAPAN, 2018, 203 (04) : 31 - 44
  • [36] A Differential Evolution Algorithm With Dual Populations for Solving Periodic Railway Timetable Scheduling Problem
    Zhong, Jing-Hui
    Shen, Meie
    Zhang, Jun
    Chung, Henry Shu-Hung
    Shi, Yu-Hui
    Li, Yun
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2013, 17 (04) : 512 - 527
  • [37] Short-term rail rolling stock rostering and maintenance scheduling
    Giacco, Giovanni Luca
    Carillo, Donato
    D'Ariano, Andrea
    Pacciarelli, Dario
    Marin, Angel G.
    17TH MEETING OF THE EURO WORKING GROUP ON TRANSPORTATION, EWGT2014, 2014, 3 : 651 - 659
  • [38] A Two-stage Stochastic Programming Approach for Timetable Rescheduling with Reassignment of Rolling Stock under Uncertain Disruptions
    Liu, Xuan
    Zhou, Min
    Ma, Jianjun
    Wang, Bin
    Zhan, Shuguang
    Dong, Hairong
    2022 IEEE 25TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2022, : 4349 - 4354
  • [39] Integrated optimization of energy-efficient train timetable and rolling stock circulation plan with regenerative energy utilization
    Zhu, Songwei
    Wang, Yihui
    Wei, Guodong
    Zheng, Yi
    Zhou, Datian
    Besinovic, Nikola
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2025, 33
  • [40] Do Natural Disaster Experiences Limit Stock Market Participation?
    Bharath, Sreedhar T.
    Cho, DuckKi
    JOURNAL OF FINANCIAL AND QUANTITATIVE ANALYSIS, 2023, 58 (01) : 29 - 70