Rolling Stock Scheduling Algorithm for Temporary Timetable After Natural Disaster

被引:0
|
作者
Kato, Satoshi [1 ]
Nakahigashi, Taichi [1 ]
Kokubo, Tatsuya [1 ]
Imaizumi, Jun [2 ]
机构
[1] Transport Operation Systems Laboratory, Signalling and Operation Systems Technology Division
[2] Toyo University, Japan
关键词
Disasters - Mathematical programming;
D O I
10.2219/rtriqr.65.3_182
中图分类号
学科分类号
摘要
This paper focuses on rolling stock scheduling after a large-scale natural disaster. In general, a temporary timetable is generated when sections of a line are partially disrupted by damage caused by the natural disaster. The next step is to generate a rolling stock schedule that is as close as possible to the original schedule at the time of timetable revision. We propose a two-phase rolling stock scheduling algorithm based on a mathematical programming method to cope with the temporary timetable. In addition, we confirm that the proposed algorithm can produce a practical rolling stock schedule in terms of evaluation criteria and computational time. © 2024 Ken-yusha Inc.. All rights reserved.
引用
收藏
页码:182 / 187
相关论文
共 50 条
  • [1] Optimization Approach to Rolling Stock Scheduling for Timetable Temporarily Changed due to Disaster
    Kato S.
    Imaizumi J.
    Nakahigashi T.
    Kokubo T.
    IEEJ Transactions on Industry Applications, 2023, 143 (05) : 405 - 416
  • [2] Timetable Sparsification by Rolling Stock Rotation Optimization
    Borndoerfer, Ralf
    Breuer, Matthias
    Grimm, Boris
    Reuther, Markus
    Schade, Stanley
    Schlechte, Thomas
    OPERATIONS RESEARCH PROCEEDINGS 2017, 2018, : 723 - 728
  • [3] Maintenance scheduling of rolling stock using a genetic algorithm
    Sriskandarajah, C
    Jardine, AKS
    Chan, CK
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (11) : 1130 - 1145
  • [4] Integrated Scheduling Method of Timetable and Rolling Stock Assignment Scheme Considering Long and Short Routing
    Jin B.
    Guo Y.
    Wang Q.
    Sun P.
    Feng X.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (03): : 173 - 181
  • [5] Integration of timetable planning and rolling stock in rapid transit networks
    Luis Cadarso
    Ángel Marín
    Annals of Operations Research, 2012, 199 : 113 - 135
  • [6] Integration of timetable planning and rolling stock in rapid transit networks
    Cadarso, Luis
    Marin, Angel
    ANNALS OF OPERATIONS RESEARCH, 2012, 199 (01) : 113 - 135
  • [7] ROLLING STOCK SCHEDULING BY COMPUTER.
    Iida, Yoshihisa
    Ohkawa, Misumi
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 1980, 21 (02): : 72 - 79
  • [8] Integrated train timetable and rolling stock circulation plan scheduling with the virtual coupling technology for a Y-shaped metro line
    Wang, Zhikai
    Su, Boyi
    2022 IEEE 25TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2022, : 1764 - 1769
  • [9] A rolling horizon for rolling stock maintenance scheduling problem with activities
    Folco, Pietro
    Sahli, Abderrahim
    Belmokhtar-Berraf, Sana
    Bouillaut, Laurent
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [10] Optimisation of rolling stock, timetable and traction power supply for an urban railway system
    Smulders, HWM
    Martins, JD
    Gonçalves, PG
    Stam, RTJ
    Urban Transport XI: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2005, : 207 - 216