Evaluation of preventive maintenance schedule and overhauling schedule for a continuous process plant

被引:0
|
作者
Mukherjee, B.N. [1 ]
机构
[1] 16/2/L Dover Terrace, Ballygunge, Kolkata 700 019, India
来源
| 2002年 / Institution of Engineers (India)卷 / 82期
关键词
Life cycle - Lubricating greases - Machine components - Preventive maintenance - Production control - Quality control - Scheduling - Wear of materials;
D O I
暂无
中图分类号
学科分类号
摘要
This article evaluates the preventive maintenance schedule and the overhauling schedule for process/production machinery of a jute factory operating round the clock. The preventive maintenance schedule or, else say, frequency of preventive maintenance for any particular group of machines depends on various factors including work content, availability of relevant spare components, availability of requisite maintenance manpower, time period needed for completion of the said job, availability of appropriate quantity and grade of fluid and grease lubricant and workshop facilities. The overhauling schedule or frequency of overhauling for any particular group of machines depends on the rate of wear of both static and dynamic components and, hence, average minimum life of the same, downtime, product quality, production and productivity.
引用
收藏
相关论文
共 50 条
  • [31] HUBER SILICA PLANT IS ON SCHEDULE
    不详
    CHEMICAL & ENGINEERING NEWS, 2009, 87 (02) : 26 - 26
  • [32] EATING AND DRINKING AS A FUNCTION OF MAINTENANCE SCHEDULE
    VERPLANCK, WS
    HAYES, JR
    JOURNAL OF COMPARATIVE AND PHYSIOLOGICAL PSYCHOLOGY, 1953, 46 (05): : 327 - 334
  • [33] Maintenance schedule optimisation for manufacturing systems
    Nemeth, Istvan
    Kocsis, Adam
    Takacs, Donat
    Shaheen, Basheer W.
    Takacs, Marton
    Merlo, Angelo
    Eytan, Amit
    Bidoggia, Luisa
    Olocco, Paolo
    IFAC PAPERSONLINE, 2020, 53 (03): : 319 - 324
  • [34] Software maintenance implications on cost and schedule
    Hunt, Bob
    Turner, Bryn
    McRitchie, Karen
    2008 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2008, : 4513 - 4518
  • [35] Distance-Based Distributionally Robust Optimization for a Preventive Maintenance Schedule in Hydrothermal Power Systems
    Zheng, Zhijia
    Liu, Mingbo
    Zhang, Zihan
    Dong, Jiarui
    Xie, Min
    IEEE SYSTEMS JOURNAL, 2023, 17 (04): : 5487 - 5498
  • [36] Preventive maintenance optimization for a multi-component system under changing job shop schedule
    Zhou, Xiaojun
    Lu, Zhiqiang
    Xi, Lifeng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 101 : 14 - 20
  • [37] Multiobjective Optimization of Preventive Maintenance Schedule on Traction Power System in High-Speed Railway
    Min, Liu Xiao
    Yong, Wu Jun
    Yuan, Yang
    Yan, Xu Wei
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2009 PROCEEDINGS, 2009, : 366 - +
  • [38] Modelling on-line reliability and risk to schedule the preventive maintenance of repairable assets in network utilities
    Crespo Marquez, Adolfo
    Francisco Gomez, Juan
    Moreu de Leon, Pedro
    Sola Rosique, Antonio
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2013, 24 (04) : 437 - 450
  • [39] Earliness–tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods
    Maher Rebai
    Imed Kacem
    Kondo H. Adjallah
    Journal of Intelligent Manufacturing, 2012, 23 : 1207 - 1224
  • [40] SCHEDULE-AND-PROCESS MANAGEMENT IN CONSTRUCTION OF A NUCLEAR POWER PLANT.
    Aoyama, T.
    American Society of Civil Engineers, Engineering Issues, Journal of Professional Activities, 1974, 16 (04): : 120 - 128