Evaluation of preventive maintenance schedule and overhauling schedule for a continuous process plant

被引:0
|
作者
Mukherjee, B.N. [1 ]
机构
[1] 16/2/L Dover Terrace, Ballygunge, Kolkata 700 019, India
来源
| 2002年 / Institution of Engineers (India)卷 / 82期
关键词
Life cycle - Lubricating greases - Machine components - Preventive maintenance - Production control - Quality control - Scheduling - Wear of materials;
D O I
暂无
中图分类号
学科分类号
摘要
This article evaluates the preventive maintenance schedule and the overhauling schedule for process/production machinery of a jute factory operating round the clock. The preventive maintenance schedule or, else say, frequency of preventive maintenance for any particular group of machines depends on various factors including work content, availability of relevant spare components, availability of requisite maintenance manpower, time period needed for completion of the said job, availability of appropriate quantity and grade of fluid and grease lubricant and workshop facilities. The overhauling schedule or frequency of overhauling for any particular group of machines depends on the rate of wear of both static and dynamic components and, hence, average minimum life of the same, downtime, product quality, production and productivity.
引用
收藏
相关论文
共 50 条
  • [21] MAINTENANCE OF COMMUTER TRAIN SCHEDULE
    NEWELL, GF
    POTTS, RB
    OPERATIONS RESEARCH, 1964, 12 : B50 - &
  • [22] Advance maintenance planning and schedule
    Dreyer, Samuel L.
    2006 IEEE AUTOTESTCON, VOLS 1 AND 2, 2006, : 325 - 331
  • [23] Algorithms for locomotives maintenance schedule
    Lazarev, A. A.
    Grishin, E. M.
    Galakhov, S. A.
    Tarasov, G. V.
    IFAC PAPERSONLINE, 2019, 52 (13): : 951 - 956
  • [24] The machine defines the maintenance schedule
    Fayad, CA
    Turazzi, R
    INTECH, 1999, 46 (09) : 63 - 65
  • [25] A heuristic model for risk and cost impacts of plant outage maintenance schedule
    Hadavi, S. Mohammad Hadi
    ANNALS OF NUCLEAR ENERGY, 2009, 36 (07) : 974 - 987
  • [26] SIMULATING SCHEDULE OPTIMIZATION PROBLEM IN STEELMAKING CONTINUOUS CASTING PROCESS
    Yang, Z.
    Qiu, H-L
    Luo, X-W
    Shen, D.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2015, 14 (04) : 710 - 718
  • [27] Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system
    Chelbi, Anis
    Rezg, Nidhal
    Radhoui, Mehdi
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (02) : 161 - +
  • [28] Optimal Preventive Maintenance Schedule Based on Lifecycle Cost and Time-Dependent Reliability
    Li, Jing
    Mourelatos, Zissimos
    Singh, Amandeep
    SAE INTERNATIONAL JOURNAL OF MATERIALS AND MANUFACTURING, 2012, 5 (01) : 87 - 95
  • [29] THE RESEARCH OF OPTIMIZATION OF UNION UN-REPAIRED EQUIPMENTS SET AND PREVENTIVE MAINTENANCE SCHEDULE
    Ji, Yong-Xin
    Yang, Guang-Hui
    Wang, Lin-Xian
    Li, Chun-Jian
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 536 - 544
  • [30] Evaluating the relationship between process improvement and schedule deviation in software maintenance
    Jung, Ho-Won
    Goldenson, Dennis R.
    INFORMATION AND SOFTWARE TECHNOLOGY, 2009, 51 (02) : 351 - 361