共 50 条
- [1] Modern state of the 'Three canyons' hydraulic power system (HPS) construction Gidrotekhnicheskoe Stroitel'stvo, 2001, (05): : 46 - 50
- [2] Technical features of the 'Three canyons' hydraulic power system (HPS) construction Gidrotekhnicheskoe Stroitel'stvo, 2002, (04): : 38 - 41
- [3] Some aspect of the stage-by-stage construction (SSC) of the hydraulic power system (HPS) with high dams Gidrotekhnicheskoe Stroitel'stvo, 2003, (08): : 2 - 11
- [5] Renovating the Gergebil hydraulic power system (HPS) Gidrotekhnicheskoe Stroitel'stvo, 2002, (12): : 56 - 59
- [6] Peculiarities of structures and construction of the Kousar hydraulic power system (HPS) on the Kheyrabad river (Iran) Gidrotekhnicheskoe Stroitel'stvo, 1999, (07): : 44 - 54
- [7] Dam of the Tilezdit hydraulic power system (HPS) In Algeria Gidrotekhnicheskoe Stroitel'stvo, 2005, (12): : 45 - 48
- [8] Thirty-year experience of the Chirkey hydraulic power system (HPS) operation Gidrotekhnicheskoe Stroitel'stvo, 2004, (09): : 4 - 6
- [9] Social and ecological aspects of the 'Three canyons' hydraulic power system (HPS) project Gidrotekhnicheskoe Stroitel'stvo, 2001, (05): : 51 - 53
- [10] SOME THEORETICAL AND METHODOLOGICAL PROBLEMS IN ORGANIZATION DEVELOPMENT WORK NORDISK PSYKOLOGI, 1974, 26 (03): : 178 - 188