Analysis of Main Girder Mechanical Property of Main Bridge of Qingshan Changjiang River Highway Bridge in Wuhan

被引:0
|
作者
Zhang, Jian-Qiang [1 ]
Sun, Li-Shan [1 ]
Hu, Hui-Yue [1 ]
Zhang, Yan-Fei [1 ]
机构
[1] China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan,430050, China
关键词
Box girder bridges - Loads (forces) - Cables - Life cycle - Steel bridges - Bearing capacity - Steel beams and girders - Fatigue testing - Composite beams and girders - Bridge decks;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of Qingshan Changjiang River Highway Bridge in Wuhan is a hybrid girder cable-stayed bridge with a main span of 938 m. The bridge deck is 48 m wide, with integral steel box girders in the central span and steel box-concrete composite girders in the side spans. To study the mechanical property of the very wide main girder of long-span bridge under heavy vehicle loads, the finite element model of the fish-bone-shaped girder of the full bridge was built to analyze the global load bearing condition of the bridge. The local models of main girder sections were established to analyze the local load bearing conditions of the central span deck, steel girder in the steel-concrete joint section in the side spans and hybrid joints. The uniformity coefficient of longitudinal stresses in main girder was calculated and the stress distribution traits of the very wide main girder were analyzed. The fatigue performance of the orthotropic steel deck under heavy vehicle loads was analyzed. The results demonstrate that the overall stiffness of the main girder is big and the calculation indexes of both the global and local models can meet the code requirements. The portion of shear force in the edge and central webs of side-span main girder is in low correlation with the web area. The uniformity coefficients of longitudinal stresses in cross-sections at different locations of the main girder are of wide difference. The design of fatigue-sensitive details of main girder can meet the service requirements in the design life cycle of the bridge. © 2020, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:26 / 31
相关论文
共 50 条
  • [31] Design of main bridge of Cuntan Changjiang River Bridge in Chongqing
    Tang, H.-Q. (tanghq@brdi.com.cn), 1600, Wuhan Bridge Research Institute (43):
  • [32] Study of mechanical characteristics of main ship channel bridge of Hutong Changjiang River Bridge
    Hu, Suo-Ting
    Guo, Hui
    Ju, Xiao-Chen
    Bridge Construction, 2015, 45 (06) : 18 - 23
  • [33] Design of Main Bridge of Pailou Changjiang River Bridge in Wanzhou
    Liu, Ke-Feng
    Cai, Dun-Song
    Yang, Guang-Wu
    Bridge Construction, 2020, 50 : 109 - 114
  • [34] Overall Design of Main Bridge of Wufengshan Changjiang River Bridge
    Tang, He-Qiang
    Xu, Gong-Yi
    Liu, Han-Shun
    Bridge Construction, 2020, 50 (06) : 1 - 7
  • [35] Design of main span 938m cable-stayed bridge for Wuhan Qingshan Yangtze River Bridge
    Xu Gongyi
    Zhang Yanfei
    Hu Huiyue
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 4117 - 4121
  • [36] Erection Techniques for Steel Girder over Side Pier of Main Bridge of Third Wuhu Changjiang River Bridge
    Li, Xu
    Liu, Ai-Lin
    Wang, Ling-Xia
    Bridge Construction, 2021, 51 (06) : 132 - 138
  • [37] Key Construction Techniques for Main Girder of South Branch Navigation Channel Bridge of Bianyuzhou Changjiang River Bridge
    Wang, Fang-Jin
    Zhang, Xiao-Chuan
    Bridge Construction, 2022, 52 (03) : 8 - 15
  • [38] Construction techniques for closure of side span steel girder of main bridge of Anqing Changjiang River Railway Bridge
    Sun, Jian-Jia
    Bridge Construction, 2014, 44 (03) : 109 - 113
  • [39] Overall Design of Main Bridge of Chongqing Nanjimen Changjiang River Bridge
    Wang, Fan
    Li, Xiao-Gang
    Lai, Ya-Ping
    Qi, Yong
    Bridge Construction, 2019, 49 (01) : 89 - 94
  • [40] Overall Design of Main Bridge of Baidicheng Changjiang River Bridge in Chongqing
    Liu, Xiao-Hui
    Zheng, Sheng-Bao
    Chen, Feng-Min
    Li, Zhong-Ping
    Deng, Yao
    Bridge Construction, 2022, 52 (05) : 100 - 106