The main bridge of Qingshan Changjiang River Highway Bridge in Wuhan is a hybrid girder cable-stayed bridge with a main span of 938 m. The bridge deck is 48 m wide, with integral steel box girders in the central span and steel box-concrete composite girders in the side spans. To study the mechanical property of the very wide main girder of long-span bridge under heavy vehicle loads, the finite element model of the fish-bone-shaped girder of the full bridge was built to analyze the global load bearing condition of the bridge. The local models of main girder sections were established to analyze the local load bearing conditions of the central span deck, steel girder in the steel-concrete joint section in the side spans and hybrid joints. The uniformity coefficient of longitudinal stresses in main girder was calculated and the stress distribution traits of the very wide main girder were analyzed. The fatigue performance of the orthotropic steel deck under heavy vehicle loads was analyzed. The results demonstrate that the overall stiffness of the main girder is big and the calculation indexes of both the global and local models can meet the code requirements. The portion of shear force in the edge and central webs of side-span main girder is in low correlation with the web area. The uniformity coefficients of longitudinal stresses in cross-sections at different locations of the main girder are of wide difference. The design of fatigue-sensitive details of main girder can meet the service requirements in the design life cycle of the bridge. © 2020, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:26 / 31
相关论文
共 50 条
  • [11] Key Base Sealing Techniques for North Main Pier Steel Cofferdam of Qingshan Changjiang River Highway Bridge in Wuhan
    Hu, Hai-Bo
    Zhou, Ya-Dong
    Zhang, Jing
    Bridge Construction, 2021, 51 (01) : 8 - 13
  • [12] Design of Main Bridge of Baiyang Changjiang River Highway Bridge
    Shu, Jiang
    Liu, Qi
    Peng, Yuan-Cheng
    Bridge Construction, 2019, 49 (01) : 77 - 82
  • [13] Design of Main Bridge of Zhuankou Changjiang River Highway Bridge
    Feng, Peng-Cheng
    Ding, Ren-Jun
    Chen, Yi-Ming
    Fu, Kun
    Liu, Qi
    Bridge Construction, 2017, 47 (04): : 1 - 6
  • [14] Structural design of main girder of main ship channel bridge of Hutong Changjiang River Bridge
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 6 (47-52):
  • [15] Overall Design of Main Bridge of Shishou Changjiang River Highway Bridge
    Chen, Hu-Cheng
    Zhang, Jia-Yuan
    Liu, Ming-Hu
    Ding, Wang-Xing
    Shen, Hao
    Bridge Construction, 2017, 47 (05) : 6 - 11
  • [16] Overall Design of Main Bridge of Qipanzhou Changjiang River Highway Bridge
    Wang, Zhi-Cheng
    Yan, Yong-Lun
    Xu, Guo-Ping
    Zhou, Shan-Shui
    Bridge Construction, 2022, 52 (03) : 106 - 112
  • [17] Safety Risk Evaluation for Qingshan Changjiang River Highway Bridge in Wuhan in Construction Stage
    武汉青山长江公路大桥施工阶段安全风险评估
    1600, Wuhan Bridge Research Institute (50): : 38 - 43
  • [18] Installation and Traction Techniques for Stay Cables of Qingshan Changjiang River Highway Bridge in Wuhan
    Wang, Zhi-Gang
    Qin, Yong-Xi
    Zhou, Qiang-Sheng
    Yao, Yong-Feng
    Jiang, Hua
    Bridge Construction, 2020, 50 : 133 - 138
  • [19] Key Construction Techniques for Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Xing-Hua
    Pan, Dong-Fa
    Bridge Construction, 2020, 50 (04) : 9 - 16
  • [20] Design of main navigable span bridge of Chizhou Changjiang River Highway Bridge
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 4 (92-96):