Developing a cost-predictive model for hospital construction projects

被引:0
|
作者
Alriabi, Mohammad Y. [1 ]
Almohsen, Abdulmohsen S. [1 ]
Alsanabani, Naif M. [1 ]
Al-Gahtani, Khalid S. [1 ]
机构
[1] King Saud Univ, Coll Engn, Dept Civil Engn, POB 800, Riyadh 11421, Saudi Arabia
关键词
Cost; hospital; experts; variables; regression model;
D O I
10.1080/13467581.2024.2397119
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hospital construction projects require the integration of innovative technologies, making them complex and challenging to estimate accurately. Without reliable guidelines, lists of considerations, or predictive models, decision-makers may choose an unsuitable contractor, leading to cost overruns and project delays. This research used quantitative and qualitative methods, including expert opinions and focus groups, to address this issue and identify critical factors affecting cost estimation in hospital construction. Using multi-regression analysis, historical data was analyzed to establish a cost-predictive model. The study identified 24 factors that determine the most critical criteria affecting the cost estimation of hospital construction. This model can evaluate the estimated direct cost provided to decision-makers in the early stages of the project with over 95% accuracy. The research results can assist professionals in the construction industry in better estimating and managing the costs of hospital construction projects, reducing risks, and improving project outcomes. Key findings indicate that specific components such as site and electrical works show average percentage errors of 8.02% and 5.11%, respectively, highlighting areas prone to cost estimation inaccuracies. This insight directs focus on improving accuracy in these critical sectors, thus further refining cost management strategies for hospital construction projects.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Developing a cost normalization framework for phase-based performance assessment of construction projects
    Choi, Jiyong
    Yun, Sungmin
    de Oliveira, Daniel P.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (12) : 1075 - 1086
  • [32] Developing and validating a predictive model for future emergency hospital admissions
    Stylianou, Neophytos
    Young, Jason
    Peden, Carol J.
    Vasilakis, Christos
    HEALTH INFORMATICS JOURNAL, 2022, 28 (02)
  • [33] Structural model of cost overrun factors affecting Pakistani construction projects
    Memon, Aftab Hameed
    Memon, Abdul Qadir
    Memon, Muneeb Ayub
    Sahito, Jam Shahzeb Khan
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2023, 42 (02) : 108 - 123
  • [34] Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects
    Hyari, Khaled Hesham
    Al-Daraiseh, Ahmad
    El-Mashaleh, Mohammad
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [35] Developing an Integrative Data Intelligence Model for Construction Cost Estimation
    Ali, Zainab Hasan
    Burhan, Abbas M.
    Kassim, Murizah
    Al-Khafaji, Zainab
    COMPLEXITY, 2022, 2022
  • [36] Least - cost scheduling of Construction Projects
    Faheem, Miriqbal
    Basha, Syed Saleem
    Kalam, M.A.
    International Journal of Earth Sciences and Engineering, 2010, 3 (05): : 753 - 761
  • [37] Improving cost estimation in construction projects
    Sayed, Mohamed
    Abdel-Hamid, Mohamed
    El-Dash, Karim
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 135 - 143
  • [38] COST CONTROL FOR MILL CONSTRUCTION PROJECTS
    HEATH, JB
    TAPPI, 1968, 51 (06): : A58 - +
  • [39] CHARACTERISTICS OF COST MANAGEMENT IN CONSTRUCTION PROJECTS
    Simion-Melinte, Cezar
    GLOBALIZATION AND INTERCULTURAL DIALOGUE: MULTIDISCIPLINARY PERSPECTIVES - ECONOMY AND MANAGEMENT, 2014, : 810 - 818
  • [40] Cost Control of Arbitration in Construction Projects
    Mehany, Mohammed Hashem M.
    Jennings, Scott
    Kumar, Shantanu
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (02)