A Heuristic-Based Evolutionary Approach for Joint Optimization of Job Shop Scheduling and Facility Layout

被引:0
|
作者
Xu, Wei [1 ]
Wan, Yi [2 ]
机构
[1] Sanjiang Univ, Sch Mech & Elect Engn, Nanjing 210012, Peoples R China
[2] Nanjing Xiaozhuang Univ, Sch Environm Sci, Nanjing 211171, Peoples R China
来源
IEEE ACCESS | 2024年 / 12卷
基金
中国博士后科学基金;
关键词
Job shop scheduling problem; facility layout problem; ant colony system; genetic programming; dispatching rule; ANT COLONY OPTIMIZATION; VARIABLE NEIGHBORHOOD SEARCH; PARTICLE SWARM OPTIMIZATION; DISPATCHING RULES; ALGORITHM; BENCHMARKS;
D O I
10.1109/ACCESS.2024.3427144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Job shop scheduling (JSS) aims to arrange the processing sequence of a series of operations to optimize the cost objective. The most common objective is to minimize the makespan without considering the flow time of materials between machines. However, in practical production scenarios, the material flow time directly affects the completion time of operations. Besides, facility layout (FL) is the premise of JSS. FL problem can be stated as assigning a range of production machines into the physical environment of the shop floor, which largely determines the time cost of material flow between machines. The result of FL will affect subsequent JSS. Therefore, the FL problem and the JSS problem naturally constitute a two-stage joint optimization problem. So far, the above-mentioned joint optimization problem is rarely studied in the literature because of the complexity of the problem. For this purpose, the joint optimization problem of FL and JSS is defined in this paper, called JSSFLP. Then, a hybrid heuristic evolutionary strategy (HHE) is proposed for solving the proposed JSSFLP. HHE consists of the meta-heuristic, the hyper-heuristic evolutionary algorithm, and the joint optimization mechanism (JOP), Among them, ant colony system (ACS), as a meta-heuristic algorithm, is used to solve the FL problem effectively, and genetic programming (GP), as a hyper-heuristic algorithm, is used to generate rule-based dispatching methods for JSS problem. Besides, JOP, as an adaptor, is designed to coordinate ACS and GP to solve JSSFLP cooperatively. Numerical experiments are conducted to demonstrate the feasibility and effectiveness of the proposed HHE and its component, respectively.
引用
收藏
页码:97630 / 97645
页数:16
相关论文
共 50 条
  • [31] A GENETIC ALGORITHM-BASED APPROACH FOR OPTIMIZATION OF SCHEDULING IN JOB SHOP ENVIRONMENT
    Ritwik, Kumar
    Deb, Sankha
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2011, 10 (02) : 223 - 240
  • [32] A Particle Swarm Optimization Approach to Joint Location and Scheduling Decisions in a Flexible Job Shop Environment
    Daliria, H.
    Mokhtari, H.
    Kamalabadi, I. Nakhai
    INTERNATIONAL JOURNAL OF ENGINEERING, 2015, 28 (12): : 1756 - 1764
  • [33] Job-shop scheduling based on Multiagent Evolutionary Algorithm
    Zhong, WC
    Liu, J
    Jiao, LC
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 925 - 933
  • [34] Heuristic method for job shop scheduling based on decomposed due date
    Institute of Automation, Shanghai Jiaotong University, Shanghai 200030, China
    Kongzhi yu Juece Control Decis, 2006, 3 (253-257):
  • [35] An Evolutionary Algorithm Based Hyper-heuristic for the Job-Shop Scheduling Problem with No-Wait Constraint
    Chaurasia, Sachchida Nand
    Sundar, Shyam
    Jung, Donghwi
    Lee, Ho Min
    Kim, Joong Hoon
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 249 - 257
  • [36] OPTIMIZATION-BASED JOB-SHOP SCHEDULING
    MUSSER, KL
    DHINGRA, JS
    BLANKENSHIP, GL
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1993, 38 (05) : 808 - 813
  • [37] Optimization-based algorithm for job shop scheduling
    Wang, Jihua
    Luh, Peter B.
    Zhao, Xing
    Wang, Jinlin
    Sadhana - Academy Proceedings in Engineering Sciences, 1997, 22 (pt 2): : 241 - 256
  • [38] An optimization-based algorithm for job shop scheduling
    Wang, JH
    Luh, P
    Zhao, X
    Wang, JL
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 1997, 22 (2): : 241 - 256
  • [39] An optimization-based algorithm for job shop scheduling
    Jihua Wang
    Peter B Luh
    Xing Zhao
    Jinlin Wang
    Sadhana, 1997, 22 : 241 - 256
  • [40] Hierarchical scheduling for multi-constrained flexible job shop based on heuristic and intelligent optimization algorithms
    Han, B. A.
    Yang, J. J.
    2017 5TH INTERNATIONAL CONFERENCE ON ENTERPRISE SYSTEMS (ES), 2017, : 85 - 92