A Heuristic-Based Evolutionary Approach for Joint Optimization of Job Shop Scheduling and Facility Layout

被引:0
|
作者
Xu, Wei [1 ]
Wan, Yi [2 ]
机构
[1] Sanjiang Univ, Sch Mech & Elect Engn, Nanjing 210012, Peoples R China
[2] Nanjing Xiaozhuang Univ, Sch Environm Sci, Nanjing 211171, Peoples R China
来源
IEEE ACCESS | 2024年 / 12卷
基金
中国博士后科学基金;
关键词
Job shop scheduling problem; facility layout problem; ant colony system; genetic programming; dispatching rule; ANT COLONY OPTIMIZATION; VARIABLE NEIGHBORHOOD SEARCH; PARTICLE SWARM OPTIMIZATION; DISPATCHING RULES; ALGORITHM; BENCHMARKS;
D O I
10.1109/ACCESS.2024.3427144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Job shop scheduling (JSS) aims to arrange the processing sequence of a series of operations to optimize the cost objective. The most common objective is to minimize the makespan without considering the flow time of materials between machines. However, in practical production scenarios, the material flow time directly affects the completion time of operations. Besides, facility layout (FL) is the premise of JSS. FL problem can be stated as assigning a range of production machines into the physical environment of the shop floor, which largely determines the time cost of material flow between machines. The result of FL will affect subsequent JSS. Therefore, the FL problem and the JSS problem naturally constitute a two-stage joint optimization problem. So far, the above-mentioned joint optimization problem is rarely studied in the literature because of the complexity of the problem. For this purpose, the joint optimization problem of FL and JSS is defined in this paper, called JSSFLP. Then, a hybrid heuristic evolutionary strategy (HHE) is proposed for solving the proposed JSSFLP. HHE consists of the meta-heuristic, the hyper-heuristic evolutionary algorithm, and the joint optimization mechanism (JOP), Among them, ant colony system (ACS), as a meta-heuristic algorithm, is used to solve the FL problem effectively, and genetic programming (GP), as a hyper-heuristic algorithm, is used to generate rule-based dispatching methods for JSS problem. Besides, JOP, as an adaptor, is designed to coordinate ACS and GP to solve JSSFLP cooperatively. Numerical experiments are conducted to demonstrate the feasibility and effectiveness of the proposed HHE and its component, respectively.
引用
收藏
页码:97630 / 97645
页数:16
相关论文
共 50 条
  • [21] ITERATIVE SIMULATION AND OPTIMIZATION APPROACH FOR JOB SHOP SCHEDULING
    Kulkarni, Ketki
    Venkateswaran, Jayendran
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1620 - 1631
  • [22] Linguistic-based meta-heuristic optimization model for flexible job shop scheduling
    Baykasoglu, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4523 - 4543
  • [23] Heuristic-based approach for an industrial three-dimensional layout problem
    Grangeon, N
    Norre, S
    Tchernev, N
    PRODUCTION PLANNING & CONTROL, 2005, 16 (08) : 752 - 762
  • [24] Machine learning and evolutionary optimization approach for solving the flexible job-shop scheduling problem
    Guo H.
    Yang J.
    Yang J.
    Journal of Intelligent and Fuzzy Systems, 2024, 46 (04): : 8845 - 8863
  • [25] Evolutionary Algorithms for Job Shop Scheduling
    Toader, Florentine Alina
    2016 8TH INTERNATIONAL CONFERENCE ON ELECTRONICS, COMPUTERS AND ARTIFICIAL INTELLIGENCE (ECAI), 2016,
  • [26] A heuristic approach to n/m job shop scheduling: Fuzzy dynamic scheduling algorithms
    Roy, U
    Zhang, XY
    PRODUCTION PLANNING & CONTROL, 1996, 7 (03) : 299 - 311
  • [27] A parallel implementation of a job shop scheduling heuristic
    Der, U
    Steinhöfel, K
    APPLIED PARALLEL COMPUTING, PROCEEDINGS: NEW PARADIGMS FOR HPC IN INDUSTRY AND ACADEMIA, 2001, 1947 : 215 - 222
  • [28] A heuristic algorithm for the job shop scheduling problem
    Yin, AH
    NETWORK AND PARALLEL COMPUTING, PROCEEDINGS, 2004, 3222 : 118 - 128
  • [29] A new heuristic algorithm for job shop scheduling
    Pan, YC
    Feng, YC
    ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 191 - 196
  • [30] Approach to job shop scheduling based on customization
    Hui, L
    Tao, H
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON INTELLIGENT MECHATRONICS AND AUTOMATION, 2004, : 724 - 727